ACC-DTA I Infantr try a and Artiller lery Branch ch
- Bradley A4 Option 2 Exercise- PCO: Scott Follen
- Production to convert A3 vehicles to A4. The conversion is an enhancement to the
power pack, mobility, situational awareness and software upgrades
- Sole Sourced, Exercise Option 2 of existing FPIF Contract
- AAO: 167 each, TAD 29 May 2020
- Bradley Track and Suspension/Fifth Order- PCO: Scott Follen
- Procure and install Modification Work Order kits (MWO) (55-Level) and material to
Bradley Fighting Vehicles. The MWOs address improvements to the Suspension and Track assemblies that drive the Bradley Fighting Vehicle (BFV).
- Existing FFP Contract that was competitive, This action is for a noncompetitive delivery
- rder to the base contract.
- AAO: 414 Each, TAD 18 December 2020