6 Visual Quality Review Committee Meeting November 6, 2013 Slide - - PowerPoint PPT Presentation

6
SMART_READER_LITE
LIVE PREVIEW

6 Visual Quality Review Committee Meeting November 6, 2013 Slide - - PowerPoint PPT Presentation

TITLE WINONA BRIDGE 6 Visual Quality Review Committee Meeting November 6, 2013 Slide 1 COMMITTEE FOCUS TOPICS Meeting 1 Meeting 4 Project Overview Railings and Barriers Bridge Piers/Overlooks River Connection/Ped-Bike


slide-1
SLIDE 1

Slide 1

TITLE WINONA BRIDGE

Visual Quality Review Committee

November 6, 2013

Meeting

6

slide-2
SLIDE 2

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 2

COMMITTEE FOCUS TOPICS

Meeting 1 Meeting 2 Meeting 3

  • Project Overview
  • Bridge Piers/Overlooks
  • Bridge Piers/Overlooks
  • Bridge Abutments and Retaining Walls
  • Bridge Abutments and Retaining Walls
  • Railings and Barriers

Meeting 4 Meeting 5 Meeting 6

  • Railings and Barriers
  • River Connection/Ped-Bike
  • Vision Statement
  • Lighting
  • River Connection/Ped-Bike
  • Lighting
  • Landscaping
  • Signage
  • Color
slide-3
SLIDE 3

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 3

LIGHTING

Roadway and Trail Lighting MnDOT Cultural Resources Guidance

  • Existing Bridge - accurately reproduce the original light standards
  • New Bridge - design new lighting that will complement the

lighting on the historic bridge, while not overshadowing it

New Bridge “Base” Design

  • MnDOT Standard Light Poles
  • 35’ Tall “Cobrahead” Style, LED
  • Recommended location - interior barrier between the trail and

roadway

  • Spacing - approximately 130-150 ft

New Bridge “Enhanced” Design Options

  • Potential Alternative Pole Styles
slide-4
SLIDE 4

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 4

LIGHTING

“Base” Design Plan View - Representative Area in the South Approach

Roadway and Trail Lighting

Winona St. New Bridge 85851 Existing Bridge 5900 3rd St. 4th.St. 2nd St. Waterfront Trail Shoreline Railroad

Replica Original Light Fixtures (Mounted to Truss Bracing) Replica Original Light Standards (Staggered Layout, Mounted on Barriers) (Note: Lighting shown in approximate original locations. Final locations dependent on light level analysis.) MnDOT Standard Light Poles (Single-side Layout, Mounted on Barriers) Through-truss

slide-5
SLIDE 5

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 5

LIGHTING

“Base” Design Cross Section Views (Looking North)

Roadway and Trail Lighting - Approach Areas

New Bridge

  • Single-side Layout on Barrier between Trail and Roadway
  • Lights both Trail and Roadway

Existing Bridge

  • Staggered Layout Both Sides of Bridge

(Note: Lighting design dependent on fj nal historic barrier design)

50’ Approx. MnDOT Standard Light Pole (Approx. 35’ Mounting Height) Original Light Standard (Approx. 20-25’ Mounting Height)

slide-6
SLIDE 6

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 6

LIGHTING

“Base” Design Cross Section Views (Looking North)

Roadway and Trail Lighting - Main Span

70’ Approx. 50’ Approx. Peak Height of Through-truss

New Bridge

  • Single-side Layout on Barrier between Trail and Roadway
  • Lights both Trail and Roadway

Existing Bridge

MnDOT Standard Light Pole (Approx. 35’ Mounting Height) Replica Original Light Fixture (Mounted to Truss Bracing)

slide-7
SLIDE 7

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 7

LIGHTING

“Enhanced” Design Options

Roadway and Trail Lighting

GL18

Single Gullwing LED luminaire shown with natural aluminum paint (NP).

slide-8
SLIDE 8

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 8

LIGHTING

Aesthetic Lighting Faith Baum, Illumination Arts

slide-9
SLIDE 9

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 9

LANDSCAPING

Considerations

  • Context
  • South Approach - Urban
  • North Approach - Floodplain Forest
  • Environmental Benefj

ts

  • Aesthetics
  • Seasonal Interest
  • Shade
  • Stormwater Treatment
  • Habitat
  • Maintenance

Overview

slide-10
SLIDE 10

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 10

LANDSCAPING

South Approach Area

Huff St. New Bridge 85851 Existing Bridge 5900 3rd St. 4th.St. 2nd St. Waterfront Trail Shoreline Railroad

Small Performance Space Infj ltration Basins Stormwater Pond, typ Paving Under Bridges RR Crossing Cross Walk, typ

Winona St. Riverview Dr.

Kiosk Overlook Terrace and Trailhead with Kiosk

Ap Ap Appr pr pr prox

  • x
  • x
  • x. 1 Ac

Ac Ac Acre re re r Ava va va v il il ilab ab ab able le le fo fo fo for r r r Re Re Re Rede de de d ve ve ve ve v lo lo lo l pm pm pmen en en ent

Entry Plaza

Ap Ap Ap Appr pr pr p ox

  • x
  • x
  • x. 1 Ac

Ac Ac Acre re re re Ava va vail il ilab ab ab ab a le le le le fo fo fo fo fo for r r r Re Re Re Re Re Rede de de de de eve ve ve v lo lo lopm pm pmen en en e t Ap Ap Ap Appr pr pr p ox

  • x
  • x. 1 Ac

Ac Acre re re Ava va va vail il ilab ab ab able le le e fo fo for r r r Re Re Re Rede de de d ve ve velo lo lo lopm pm pm pmen en en e t

Historic Paver Area

Appr p ox. 0. 0 2 Ac A re Availabl b e fo f r Redevelo

  • pment

Terraced Plantings Boulder Terraces Planting Bed and Low Wall, typ Stone Seat Walls, typ Potential Stair

slide-11
SLIDE 11

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 11

LANDSCAPING

South Approach Area - Materials Palette

  • Informal Urban Promenade
  • Rain Gardens
  • Massings of Perennials and

Grasses

  • Native Limestone Seat Wall

and Planters

  • Tree and Shrub Groupings

Limestone Terraces Perennial and Grass Massings Stone Seat Wall Rain Gardens

slide-12
SLIDE 12

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 12

LANDSCAPING

View Below Bridges from 2nd St.

South Approach Area

slide-13
SLIDE 13

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 13

LANDSCAPING

Shoreline New Bridge 85851 Stone Steps to Remain Additional Retaining Wall and Railing Abutment Business Marina Parking Existing Bridge 5900 Existing Bridge 5930 Boathouses Main Channel Back Channel

100 Year Flood Elevation

North Approach Area

Trail Under Bridges

slide-14
SLIDE 14

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 14

LANDSCAPING

North Approach Area - Materials Palette

Concrete Seat Wall

  • Floodplain Forest Clusters
  • Native Prairie Seeding on

Upland Areas

  • Native Wet Meadow

Seeding Around Ponds

  • Shrub Massings
  • Shoreline Re-vegetation
slide-15
SLIDE 15

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 15

SIGNAGE

South Approach Area

Plan View Sign 1 Messages Sign 2 Message

Winona St. New Bridge 85851 Existing Bridge 5900 3rd St. 4th.St. 2nd St. Waterfront Trail Shoreline Railroad

Overhead Sign Bridge (Sign 1) Cantilever Overhead Sign (Sign 2)

slide-16
SLIDE 16

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 16

SIGNAGE

South Approach Area

Overhead Sign Bridge Structure Cantilever Sign Structure

slide-17
SLIDE 17

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 17

SIGNAGE

North Approach Area

Shoreline New Bridge 85851 Business Marina Parking Existing Bridge 5900 Existing Bridge 5930 Boathouses Main Channel Back Channel

Plan View Sign 3 Message

Potential State Entrance Sign Trail Under Bridges Cantilever Overhead Sign (Sign 3)

slide-18
SLIDE 18

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 18

SIGNAGE

North Approach Area

Existing Type 3 Sign Type 1 Sign Type 2 Historic Sign

Note: Further input from MnDOT’s Site Development Unit that manages State Entry Signs statewide is required.

slide-19
SLIDE 19

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 19

COLOR

Overview Considerations

  • Historic Review
  • Existing Bridge Finish Under Review
  • “Two Bridges as One” Theme
  • Surroundings
  • Bluf

Geology

  • Prominent Buildings
  • Sun Angle
  • Seasonal Change
  • Surfaces
  • Concrete
  • Steel

Original Unfj nished Concrete Surfaces Surface Finish Later Applied to Concrete Surfaces in Approach Areas

slide-20
SLIDE 20

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 20

COLOR

Surroundings

slide-21
SLIDE 21

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 21

COLOR

Color Concept A

Main Piers - Summer Main Piers - Winter

slide-22
SLIDE 22

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 22

COLOR

Color Concept A

Approach Piers - Summer

(Not Including Ground Level Design - Structure Only)

Approach Piers - Winter

(Not Including Ground Level Design - Structure Only)

slide-23
SLIDE 23

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 23

COLOR

Color Concept B

Main Piers - Summer Main Piers - Winter

slide-24
SLIDE 24

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 24

COLOR

Color Concept B

Approach Piers - Summer

(Not Including Ground Level Design - Structure Only)

Approach Piers - Winter

(Not Including Ground Level Design - Structure Only)

slide-25
SLIDE 25

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 25

COLOR

Color Palettes

Concrete Colors Steel Colors

slide-26
SLIDE 26

Winona Bridge Visual Quality Review Committee Meeting 6 Slide 26

NEXT STEPS

Opportunity for Summary Recap Project Transition to Final Design Phase