1
1 DISCLAIMER This document, any attachments and the oral - - PowerPoint PPT Presentation
1 DISCLAIMER This document, any attachments and the oral - - PowerPoint PPT Presentation
1 DISCLAIMER This document, any attachments and the oral presentation on the slides (together the "Presentation") have been prepared and are being supplied to you by Aura Energy Limited (the "Company") solely for information
2
DISCLAIMER
This document, any attachments and the oral presentation on the slides (together the "Presentation") have been prepared and are being supplied to you by Aura Energy Limited (the "Company") solely for information purposes in connection with a potential offering of securities by the Company and admission of its securities to trading on AIM, a market operated by London Stock Exchange plc. This Presentation is confidential and must not be copied, reproduced, published, distributed, disclosed- r passed to any other person at any time.
- f publication. To the fullest extent permitted by law, no liability whatsoever, whether in negligence or otherwise, (save in the case of fraud) arising directly or indirectly from the use of this document is accepted, and no representation, warranty or
- r regulation or which would require any registration or licensing within such jurisdiction. Any failure to comply with these restrictions may constitute a violation of law.
- amended. In addition, in the United Kingdom, this Presentation is addressed and directed only at qualified investors within the meaning of section 86 of the Financial Services and Markets Act 2000 ("FSMA") who (i) are persons who have professional
- r delivered, directly or indirectly, in or into the United States, Australia, Canada or Japan or any other jurisdiction where such offer or sale would violate the relevant securities laws of such jurisdiction.
- perating expenditure) will be realised.
- f and no reliance should be placed on such forward‐looking statements. These forward-looking statements speak only as at the date of this Presentation. The Company, WHI, their respective professional advisers and contractors (subject to their legal
- bligations) expressly disclaim any obligations to update or revise any forward-looking statement contained herein to reflect any change in expectations with regard thereto or any change in events, conditions or circumstances on which any statement
- investment. Results can be positively or negatively affected by market conditions beyond the control of the Company or any other person.
3
AURA SNAPSHOT
4
PROJECT PORTFOLIO
- ₃ ₈
- ₃ ₈
- ★
★
5
₃ ₈
₃ ₈
C O N T R A C T U ₃ O ₈ P R I C E – U S $ 4 2 / l b * S P O T U ₃ O ₈ P R I C E – U S $ 2 6 . 1 0 / l b * ₃ ₈
6
DEVELOPMENT STRATEGY
TIRIS FEASIBILITY STUDY IN 12 MONTHS TIRIS CONSTRUCTION H2 2017 – SUBJECT TO FUNDING PROJECT FINANCE TIRIS INTO PRODUCTION MID 2018 S I M P L E PAT H T O C A S H F L O W
2 0 1 6 2 0 1 8
C O N T I N U E T O A S S E S S N E W O P P O R T U N I T I E S
7
URANIUM DRIVERS
Electricity Forecast to Rise 76% by 2030
(Source: World Nuclear Association, March 1, 2016)
Forecast new reactors by 2030. (Source: World Nuclear Association, March 1, 2016)
500+ reactor’s
built & under construction 500+ planned & proposed by 2030
8
URANIUM MARKET DRIVERS
9
PROJECTS
T I R I S U R A N I U M – M A U R I TA N I A TA S I A S T S O U T H G O L D – M A U R I TA N I A S O D A A S H & L I T H I U M – M A U R I TA N I A H Ä G G Å N U R A N I U M – S W E D E N
9
10
TIRIS URANIUM PROJECT
- ₃ ₈
- M A U R I TA N I A
11
TIRIS – MINING REGION
- ESTABLISHED RESOURCE PLAYERS IN THE REGION
12
TIRIS URANIUM DEPOSITS
Soda Ash – Lithium Deposit
13
TIRIS GEOLOGY
₃ ₈ ₃ ₈
14
C A L C R E T E D E P O S I T W I T H C A R N O T I T E U R A N I U M I N A W E AT H E R E D G R A N I T E H O S T F R E E D I G G I N G M I N I N G , N O D R I L L A N D B L A S T P E R M I T T I N G I N A R E M O T E D E S E R T R E G I O N U R A N I U M M I N E R A L I S AT I O N A S C A R N O T I T E
R E V E A L S M I N E R A L I S AT I O N
14
15
SIMPLE ORE UPGRADE
15
16
TIRIS SCOPING STUDY
R E L E A S E D J U LY 2 0 1 4
- ₃ ₈
- ₃ ₈
- ₃ ₈
- ₃ ₈
- ₃ ₈
17
FEASIBILITY STUDY UNDERWAY
Update significant portion of resource to Measured and Indicated Beneficiation testwork on ore zones ESIA (enviro) studies programme Defining water sources – quantity and quality Leach testwork Mining study Assessment of transport and infrastructure requirements Process engineering Application for Exploitation Permit
☐ ☐ ☐ ☐ ☐
TA R G E T T O C O M P L E T E T I R I S F E A S I B I L I T Y S T U D Y I N 1 2 M O N T H S A N D C O M M E N C E M I N E C O N S T R U C T I O N I N H 2 2 0 1 7
18
STRATEGIC CHINESE MOU
19
EXPLORATION UPSIDE
20
- TGRC 022
71m @ 0.3 g/t Au incl:
- 5m @ 1.2 g/t Au,
- 3m @ 1.0 g/t Au
- 11m @ 0.5 g/t Au
TGRC 007 38m @ 0.4 g/t Au incl:
- 1m @ 6.1 g/t Au
- 6m @ 0.7 g/t Au
21
TIRIS - SODA ASH & LITHIUM
22
- O N E O F T H E L A R G E S T U N D E V E L O P E D U R A N I U M
P R O J E C T S I N T H E W O R L D , W I T H 8 0 3 M l b s I N F E R R E D U R A N I U M R E S O U R C E
S W E D E N
★
23
EXCELLENT LOCALITY
24
LOW CAPEX – BIO HEAP LEACH
- “Bio-
leaching” ‘’bio – leaching’’ March 2005. ‘’proce design’’
GTK crib test at Outokumpu town Source GTK
25
LOW COST, HIGH MARGIN PROJECT [1]
M T PA A P P R O X C A P E X * $ m O P C O S T U S $ / l b U ₃ O ₈ M l b s p . a . M o M L B S p . a . N i M L B S p . a . 5 * 1 9 0 1 8 . 0 0 - 2 2 . 0 0 1 . 4 0 . 6 2 . 4 3 0 . 0 5 4 0 1 3 . 5 0 7 . 8 4 . 3 1 4 . 8
26
KEY COMPANY DATA
C O R P O R AT E S T R U C T U R E
Share Price A cents 1.8cps Shares On Issue 457m Options On Issue 197m Market Capitalisation A$8.2m Cash (30/9/15) A$0.427 Enterprise Value A$7.78m
Cents Per Share 2 4 6 8 10 12 0.01 0.012 0.014 0.016 0.018 0.02 0.022 0.024 Jun 15 Aug 15 Oct 15 Dec 15 Feb 16 Apr 16
Millions
Daily Volume Last Price (cents)
27
WHY AURA ENERGY?
28
29
TIRIS FEASIBILITY TEAM
30
URANIUM RESOURCES
T I R I S R E S O U R C E - M AU R I TA N I A
1 0 0 p p m c u t - o f f To n n e s G r a d e M l b s U 3O 8
Indicated 2 300 2 Inferred 64 335 47 Total 66 334 49
1 0 0 p p m U 3O 8 c u t -
- f f
T O N N E S ( B T ) U 3 O 8 ( P P M ) M O ( P P M ) V ( P P M ) N I ( P P M ) Z N ( P P M )
- ₃ ₈
31
WATER INFRASTUCTURE
32
URANIUM SUPPLY VS DEMAND
33
PRIMARY SUPPLY FORCAST
34
SECONDARY SUPPLY FORECAST
35
NUCLEAR CAPACITY
36
INCENTIVE PRICE CURVE
37
TIRIS PROCESS FLOWSHEET
- ₃ ₈
38
TIRIS PERMITTING PROCESS