SLIDE 10 Costs
Cooking Lighting
Rural Urban Total
Total No of HH (million)
167 84 251 HH 74
HH deprived (million)
148 8 156 Demand (MW) 7772
Cost of biogas (per m3) plant (Rs.)
5000 8000 Capacity cost (000 s/KW) 60 - 80
Requirement of gas per HH (m3)
1 1 1 T & D cost (000 Rs./KW) 10 - 35
Total installation cost (billion Rs.)
743 67 810 Cost/village (Rs. million) 0.9 to 1.4
Piping requirement (m) per HH
25 15 25 Total cost (Rs. billion) 817
Piping cost per km (Rs.)
60000 60000 60000 Street lighting 5.4
Piping cost (Rs. billion)
166 11 176 Grand total 823
Total cost (Rs. billion)
965 75 1040