Whe here re Have e Al All The he Rider ers s Gone? ne? Agenc ency y Res esponse ponse TFLEX October 30, 2017 Rob Smith, AVP Service Planning & Scheduling, DART 1 Bac ackgr ground ound Like many other US transit systems,


slide-1
SLIDE 1

1

Whe here re Have e Al All The he Rider ers s Gone? ne? Agenc ency y Res esponse ponse

TFLEX October 30, 2017

Rob Smith, AVP Service Planning & Scheduling, DART

slide-2
SLIDE 2

2

  • Like many other US transit systems, DART has seen recent

ridership declines, particularly on bus service

  • We believe this is due to a number of factors
  • One key issue we are now working on is what we can do to

re-design our bus service to better meet current and emerging needs

Bac ackgr ground

  • und
slide-3
SLIDE 3

3

Mode FY17 vs. FY16 (11 Month ths)

Bus

 5.3%

Light Rail

 1.3%

Commuter Rail

 2.0%

Paratransit

 2.0% Cur urrent rent DAR ART Rid ider ership hip Trends ends

slide-4
SLIDE 4

4

  • Passengers moving from bus to an expanded rail network

– Rail ridership continues to grow

  • Long-term reductions in bus service, as recently as 2012

– Overall bus service reductions of around 20%

  • Suburbanization of employment, in many cases outside the

service area entirely

– DART and other DFW-area agencies only serve half of the metro population – Job growth has been much higher outside of the service area

Wha hat t Has as Fac actored tored In Into to Dec ecli lines es in in Dal alla las?

slide-5
SLIDE 5

5

  • Gentrification pushing low-income riders out of many

inner-city neighborhoods

– Older homes are being replaced by new apartments – Densities are up, but new residents are not using transit – Are the displaced residents even in the service area?

  • Competition with transportation network providers,

especially for many urban trips

– DART is working on partnerships, but there is noticeable impact

Wha hat t Has as Fac actored tored In Into to Dec ecli lines es in in Dal alla las?

slide-6
SLIDE 6

6

  • In 2014 DART embarked on a multi-year effort to plan for

future bus service changes (some work is still underway)

  • Our bus service review came in the form of a COA – the first

in several decades here

  • As a part of the COA process, we reviewed all of our bus

services, conducted extensive community outreach, developed new tools to support service planning and analysis efforts, and drafted a new service plan

COA ( A (Com

  • mprehen

prehensi sive e Oper eration ations s An Anal alys ysis is)

slide-7
SLIDE 7

7

  • We started with public outreach
  • Social media (6,000 unique visitors)
  • Rider outreach events (1,261 rider comments)
  • Public meetings
  • Stakeholder interviews
  • Advisory and technical committees

COA Pu A Publ blic ic Out utreac each h Pr Proces

  • cess
slide-8
SLIDE 8

8

  • Make routes more direct
  • Improve service frequency
  • Extend the span of service (e.g. weekends)
  • Improve on time performance and connectivity
  • The City of Dallas adopted a resolution in October

2016 recommending priorities for improved transit services

COA Pu A Publ blic ic Fee eedbac back

slide-9
SLIDE 9

9

  • Significant improvements in service frequency through

creation of a core frequent route network

  • Offering more direct route alignments in a number of

key local and crosstown corridors

  • Expanding availability of weekend service, with more

frequency, wider hours, and additional routes

  • Addition of scheduled recovery time to improve on

time performance

  • New faster, more direct limited-stop services

COA D A Draf aft t Se Servi vice ce Pl Plan an Ele leme ments ts

slide-10
SLIDE 10

10

Cor

  • re

e Frequent equent Rou

  • ute

e Ne Netw twork

  • rk

Weekd ekday y Peak Servi vice ce (15 minut nute e or less ss)

slide-11
SLIDE 11

11

  • Seven (7) corridors
  • Frequent, limited stop

layered over local routes

  • 20,000 daily riders projected

in 2028

  • Fills the crosstown service

gap not met by rail – New Cotton Belt schedule may modify approach in north Service Area

Rap apid id Rid ide e Ele leme ment

slide-12
SLIDE 12

12

  • Four (4) corridors
  • Fills gap for key

crosstown travel markets and airport access

  • May be preliminary

step to longer-term rail improvements – New Cotton Belt schedule would modify approach in north Service Area

Cros

  • ssto

town/Airpor wn/Airport t Exp xpress ess

slide-13
SLIDE 13

13

  • Proposed expansion of zones in:

– Rylie – Kleberg – NW Carrollton – North Central Plano – Garland (Sundays)

  • Potential use of partnerships

with taxis or transportation network providers to offer service at lower cost – Pilot in Farmers Branch and Park Cities

  • Later this effort expanded to a

more ambitious project

On Cal all l Zon

  • nes

es

slide-14
SLIDE 14

14

  • Improvements that will require funding will be

implemented over time as funds are available

  • Some improvements started early while COA work was still

underway

  • The current Budget and Financial Plan allows for up to

$12.5 million per year in expanded bus service, implemented in 2018 and 2019

COA Imp A Imple leme ment ntation ation

slide-15
SLIDE 15

15

FY15-16 16 Bus us Se Servi vice ce Imp Improvements ements

Focus of improvements:

  • Off-peak frequency

improvements

  • Bus connections to

recently-opened rail stations

slide-16
SLIDE 16

16

FY17 7 Bus us Se Servi vice ce Im Improvement ements

Focus of improvements:

  • Bus feeder service for rail

and Streetcar extensions

  • Service in emerging new

employment markets

slide-17
SLIDE 17

17

FY18 8 Bus us Se Servi vice ce Im Improvement ements

The first significant expansion of bus service in 15 years or more:

  • Off-peak frequency

improvements on ten routes

  • Service restructuring targeting

frequency and coverage

  • Implementation of Mobility on

Demand pilot projects

  • Schedule adjustments to

improve on time performance for five routes

slide-18
SLIDE 18

18

Mo Mobi bilit lity y on

  • n Dem

eman and

  • Mobility on Demand is a new grant-funded pilot project that includes

both service and technology elements

  • The pilot project introduces new service in six zones – three in Plano,

and three in the Southern sector of Dallas

  • The zones are designed to accommodate ”last mile” access to/from
  • ther DART services, along with internal circulation
  • All zones include a mix of dedicated vehicles (similar to current On

Call service), supplemental taxi/transportation network provider service, and new software

  • Dedicated service available 5am-8pm
  • Todd Plesko will talk about this more tomorrow
slide-19
SLIDE 19

19

FY19 19 Bus us Se Servi vice ce Im Improvement ement Can andidates idates

Focus of improvements using new bus fleet that will be available in 2019:

  • Schedule adjustments to

improve on time performance

  • Changes targeting ridership

improvements, including more frequent service on a number of routes – especially where buses run infrequently

  • Service restructuring that adds

coverage and improves service to key transit generators

slide-20
SLIDE 20

20

Whe here e Do W

  • We Go

e Go From

  • m Her

ere? e?

  • We are still working on a few issues
  • Example: there is interest in development of more of a

“grid”-like bus network, and we are assessing the cost and potential rider impacts