1
What’s on the Horizon?
Accountability, Compliance & Monitoring will have some changes based on mandates under Senate Bill 1, Rider 70 Texas 83rd Legislative Session, 2013 Performance‐Based Monitoring Analysis System (PBMAS)
Implementation beginning in 2004 SPED CTE BE/ESL Stage of Intervention Stage of Intervention Stage of Intervention Stage of Intervention NCLB
Required Determination Levels: Meets Requirement, Needs Assistance, Needs Intervention, Needs Substantial Intervention Meets Requirement =
LEA Allowable Maintenance of Effort (MOE) Flexibility
Federally Required LEA Determinations
Implementation beginning in 2005
Federally Defined Elements
- 1. Compliance SPP Indicators 9,10,11,12,13
- 2. Valid, reliable, and timely data submission
- 3. Uncorrected noncompliance
- 4. Financial audit findings
State Defined Elements
- 5. PBMAS SPED stage of intervention (2008)
- 6. Significant Disproportionality (2012)
On-site Reviews Residential Facility (RF) Monitoring
Implementation beginning in 2006
Impl plem emen entation tion of
- f St
Stan and‐Al Alone Specia Special Educ ducation ion Mo Monit nitoring ring Syste Systems (2004 (2004‐ 2011) 2011)