Federal Aviation Administration The PBN Toolbox: Building the Performance Based National Airspace System Presentation to: ICAO PBN Symposium and Workshop Name: Elizabeth L. Ray, Federal Aviation Administration Date: October 16,


slide-1
SLIDE 1

Federal Aviation Administration

The PBN Toolbox:

Building the Performance Based National Airspace System

  • Presentation to: ICAO PBN Symposium and Workshop
  • Name: Elizabeth L. Ray, Federal Aviation Administration
  • Date: October 16, 2012

Federal Aviation Administration

slide-2
SLIDE 2

Federal Aviation Administration

Global PBN Implementation

2

SAFETY

  • EFFICIENCY

SUSTAINABILITY

slide-3
SLIDE 3

Federal Aviation Administration

The PBN Toolbox

3

slide-4
SLIDE 4

Federal Aviation Administration

Right Procedure

4

Q, T, and TK Routes RNAV STAR w/OPD RNAV SID/STAR RNP AR WAAS LNAV/VNAV

slide-5
SLIDE 5

Federal Aviation Administration

Performance Based Navigation End to End

5

 Current PBN Inventory

  • 538 RNAV SIDs/STARs and 320 RNP ARs at 293 airports
  • 317 RNAV routes - 94 En route (Q), 79 Low Altitude (T) & 2 helicopter (TK)
  • More than 12,000 RNAV (GPS) - LPV/LP (WAAS), LNAV/VNAV, LNAV

 PBN Procedures Planned in FY13

  • 217 SIDs/STARs, 74 RNP ARs, 60 Q/T Routes, and 580 WAAS
slide-6
SLIDE 6

Federal Aviation Administration

Right People

6

slide-7
SLIDE 7

Federal Aviation Administration

Right Place, Right Time

7

slide-8
SLIDE 8

Federal Aviation Administration

Metroplex Projects

  • Annual Savings: Northern California
  • $6.5M - $15.5M fuel costs
  • 2.3M – 5.6M gallons of fuel
  • 23K – 56K metric tons of CO2
  • 1.5M nautical miles (filed)
  • Annual Savings: North Texas
  • $10.3M - $21.7M fuel costs
  • 4.1M – 8.6M gallons of fuel
  • 41K – 86K metric tons of CO2
  • 1.0M nautical miles (filed)
  • Annual Savings: Washington DC
  • $6.4M - $19.0M fuel costs
  • 2.5M – 7.5M gallons of fuel
  • 25K – 75K metric tons of CO2
  • Annual Savings: Charlotte
  • $10.2M - $17.0M fuel costs
  • 3.7M – 6.2M gallons of fuel
  • 35K – 59K metric tons of CO2
  • 2.5M nautical miles (filed)
  • Annual Savings: Atlanta
  • $8.3M - $22.4M fuel costs
  • 2.9M – 7.7M gallons of fuel
  • 30K – 78K metric tons of CO2
  • 1.2M nautical miles (filed)
  • Annual Savings: Southern California
  • $10.1M - $22.9M fuel costs
  • $4.0M aircraft direct operating costs
  • 3.4M – 7.8M gallons of fuel
  • 34K – 78K metric tons of CO2
  • 1.5M nautical miles (filed)
  • Annual Savings: Florida
  • TBD: Kickoff 15May 2012
  • Annual Savings: Houston
  • $9.2M - $26.1M fuel costs
  • 3.0M – 8.6M gallons of fuel
  • 31K – 87K metric tons of CO2
  • 648K nautical miles (filed)
slide-9
SLIDE 9

Federal Aviation Administration

ESLO - Equivalent Lateral Spacing Operations Atlanta Hartsfield - Jackson International Airport (ATL)

9

  • Estimated annual savings of $19.3M
  • Decreased departure delays
slide-10
SLIDE 10

Federal Aviation Administration

Greener Skies Over Seattle

10

slide-11
SLIDE 11

Federal Aviation Administration

The Future

11

  • We are moving forward with PBN and are developing

and deploying even in complex airspace

  • Collaboration in design is necessary to ensure

integration and integration is necessary to ensure use

  • The more we build, the more we learn. The more we

learn, the better we get at increasing use and delivering benefits