South Atlantic Petroleum African Exploration and Production Our - - PowerPoint PPT Presentation

south atlantic petroleum
SMART_READER_LITE
LIVE PREVIEW

South Atlantic Petroleum African Exploration and Production Our - - PowerPoint PPT Presentation

Africa is our home South Atlantic Petroleum African Exploration and Production Our Journey 10 th African Independents Forum Cape Town, South Africa November 2013 www.sapetro.com South Atlantic Petroleum: Overview South Atlantic


slide-1
SLIDE 1

… Africa is our home www.sapetro.com

South Atlantic Petroleum

African Exploration and Production – Our Journey

10th African Independents’ Forum Cape Town, South Africa

November 2013

slide-2
SLIDE 2

2

South Atlantic Petroleum: Overview

South Atlantic Petroleum (SAPETRO) is a privately held Nigerian oil & gas exploration and production company with a portfolio of high-quality assets in West, Central and East Africa in:

  • Benin
  • Central Africa Republic
  • Juan de Nova
  • Madagascar
  • Nigeria

We are focused on creating value for our stakeholders through the pursuit of rewarding exploration, development and appraisal opportunities in developed and under-explored territories in Africa

slide-3
SLIDE 3

3

South Atlantic Petroleum: Our Strategy

  • We have continued to expand our portfolio

with 6 different assets across sub-Saharan Africa spanning across:

  • Onshore, offshore
  • Exploration, Development & Production
  • Our exploration strategy continues to focus
  • n high risk/high reward acreages in

largely unexplored areas with relatively low entrance costs and large available ‘footprints’ which are

  • primarily geology/petroleum system

driven opportunities

  • with the potential for major

conventional resources in excess of a billion barrels, and are

  • Out of bid round acquisitions
  • We are focused on growing our production

in Nigeria within our existing and yet to be acquired acreages

Net Acreage Position 2 4 6 8 10 12 14 16 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 MMBBLS 10 Year Production Profile on Existing Assets 551 13,280 1,940 47,690 12,390 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 Benin CAR Nigeria Juan De Nova Madagascar Km²

slide-4
SLIDE 4

… Africa is our home www.sapetro.com

Nigeria

slide-5
SLIDE 5

5

Nigeria: Asset Overview

Storage- 2MMbbl Processing- 185kbod

Jurisdiction Federal Republic of Nigeria Licence Type Production Sharing Agreement (PSA) & Production Sharing Contract (PSC) Participating Interest OML 130 - 10% PSA; 5% PSC OPL 246 – 60% in PSA Acreage / Water Depth Size: 2,590km2 Water Depth: 1,100 – 1,800 m Operatorship Undertaken by Total under Technical Services Agreement Permit Tenor Initial 20 year period from 2005

Source: Wood Mackenzie

OML -130 OPL-246

slide-6
SLIDE 6

6

OML 130 & OPL 246: Fields & Prospects

OML Area 1,295 km2

Storage- 2MMbbl Processing- 185kbod

EGINA-MAIN (548MB) AKPO FIELD (574 MB) EGINA SOUTH (41 MB) PREOWEI-1B DISCOVERY (176 MB)

slide-7
SLIDE 7

7

Akpo

The outstanding Akpo condensate field is the block’s first development and has produced over 200 million barrels of condensate to date.

  • Discovered in: 2000
  • 2P Reserves: 574 MMbbl
  • Planned wells: 44;

22 Producers, 20 Water Injectors 2 Gas Injectors

  • Delivered Wells: 37;

22 Producers; 13 Water Injectors 2 Gas Injectors

  • Peak Production: 180,000 bcpd
  • FPSO Capacity: 2 MMbbl storage
  • First Oil:

March 2009

slide-8
SLIDE 8

8

Egina

Storage- 2MMbbl Processing- 185kbod

The Egina oil field is the block’s second multi-billion dollar deep-water project with Field Development Programme sanctioned in May 2013

  • Discovered in: 2003
  • 2P Reserves: 548 MMbbl
  • No. of wells: 39; 20 Producers,

19 Water Injectors

  • Peak Production: 200,000 bopd
  • FPSO Capacity: 2.3 MMbbl storage

208,000 bopd

  • First Oil (planned): 2017
slide-9
SLIDE 9

… Africa is our home www.sapetro.com

Benin

slide-10
SLIDE 10

10

Benin: Asset Overview

Jurisdiction Republic of Benin Licence Type Production Sharing Contract (PSC) Participating Interest 100% Acreage Size: 551km2; Water Depth: 0 – 750 m Operatorship YES Permit Tenor Sèmè Field expires 30 Nov 2030 Remaining Work Obligation 1 exploration well Rig currently drilling

= Perle-C Exploration well spudded Nov. 4, 2013

slide-11
SLIDE 11

11

Sèmè Field Redevelopment Overview

Sèmè is a brownfield development with a long and proven production history stretching back 30 years.

  • Minimum facilities offshore Conductor

Supported Platform transporting crude to shore via a 14 km long pipeline

  • 12,000 blpd capacity processing facility

incorporating a two-stage separation process with treated produced water disposed of via an outfall pipeline

  • Crude stored in two refurbished

existing 250,000 bbl capacity tanks

  • Crude export via a 7 km long pipeline

to Pipeline End Manifold (PLEM) and Conventional Buoy Mooring (CBM) for tanker offloading

slide-12
SLIDE 12

N S W E

H3 H4 H6 H6.5 H7 H8 H9

E W S N

1km 1km

1:10000

  • Perle C prospect is a four way structural

dip closure

  • Primary objectives at H6 and H6.5
  • Secondary objectives at H7 and H8
  • Cumulative oil in place approximated at

100MMstb

Perle C Exploratory Drilling

slide-13
SLIDE 13

… Africa is our home www.sapetro.com

Juan de Nova & Belo Profond

slide-14
SLIDE 14

14

Mozambique Channel Assets: Overview

Licence Juan de Nova Belo Profond Jurisdiction France – Terres Australes et Antarctiques Françaises (TAAF) Madagascar Licence Type Exploration Permit PSC Participating Interest 90% SAPETRO 10% Marex 90% SAPETRO 10% Marex Acreage Size: 52,990km2; Water Depth: 600 – 3,200m Size: 13,770km2; Water Depth: 1,800 – 3,000m Operatorship Yes Yes Licence Tenor 5 years wef 30/12/08 Awaiting approval for Renewal through 30 Dec 2018 8 years (4 Phases) ending 29 July 2015 with two (2) year extension to 2017 Remaining Work 3D Seismic (Ongoing) 3D Seismic (Ongoing); 1 well $50m

slide-15
SLIDE 15

15

Why the Mozambique Channel?

Continental Crust A large sunken continental fragment (the size of the North Sea) with continuous sedimentation for more than 200 million years and which is up to 8,000 meters in thickness Source Rocks Three proven, productive oil source rock intervals (USGS 2012 Assessment), including a massive Marine Type II Jurassic section present nearly everywhere in the acreage and mature for oil Oil Seeps Multiple recovered C-25 peaked oil samples from a small number

  • f oil slicks persistent over years

Many Structural & Stratigraphic Plays A wide variety of both structural and stratigraphic plays; 4-way and fault closed anticlines, toe thrusts, basin slope and basin floor turbidite fans, extensive Paleogene channels, possible salt sheets Excellent Tertiary Shale Seals Thick, deep water Neogene shales are widely present, salt sheets are also believed to be present as seen on the new 2012 seismic Geologic History The heart of the East African Transform Margin with mature source rocks, reservoirs, traps and seals, all on continental crust Large Acreage Position Over 80% of the entire continental fragment sub-province is contained on SAPETRO’s nearly 70,000 km2 acreage position

slide-16
SLIDE 16

16

Mozambique Channel Assets: Exploration Activities

Work 2D Seismic 3D Seismic Date Dec 2011 – April 2012 Sept 2013 - Date Volume 12,525 km >9,000km2 Contractor / Technology PGS Geophysical using Nordic Explorer with broadband Geostreamer / GeoSource PGS Geophysical using Ramform Sterling Interpretation Completed 2013 interpretation w/Robertson CGG and EMR. Identified >70 leads across the two acreages N/A Other Works Historically recurrent slick sampling with +40 samples collected. Multiple, recovered C-25 peaked oil samples from a small number of oil slicks, were found in both Juan de Nova and Belo Profond. Results indicate the presence of

  • il with affinities to the Anadarko ‘Ironclad’

discovery more than 500km away. Acquired two 30m cores and over eight 5m cores within identified slick areas. These showed evidence

  • f

thermogenic hydrocarbons associated in one case with a major 4-way dip closed structure Remaining Work 3D Seismic (Ongoing) Seismic Acquisition and Processing to define drilling prospects; 1 exploration well in each asset

slide-17
SLIDE 17

17

Exploration Work Executed

PGS Nordic Explorer PGS Ramform Sterling

slide-18
SLIDE 18

18

Technical Progress in Identifying Petroleum System Elements & Exploration Leads

  • Pseudo wells and source rock presence and maturity studies indicate a major oil-prone

petroleum system further supporting the conclusions of a 2012 USGS Assessment of Recoverable Resources

  • Reservoirs, traps, seals, and migration pathways identified
  • Meshach: a structural and seismic attribute supported lead near a persistent oil

slick/seep area awaiting sea bed imaging and coring as well as 3-D seismic survey definition

  • Resource calculations for the Area 3: 430+MM to >1000MMbbls STOOIP
  • Numerous other leads, many larger than Area 3
slide-19
SLIDE 19

19

Eastern Flank of the Davie Fracture Zone: Pseudo Well

X ing Horizons Time Depth (m)

490-1160 Sea Bottom 2900 2185 Top Eocene 3300 2579 Turonian Volcanics 4200 3497 L.Jura/Tri assic 4900 4810 Synrift Sequence 5800 6730

slide-20
SLIDE 20

20

Eastern Flank of the Davie Fracture Zone: Maturity

slide-21
SLIDE 21

21

Necessary Elements of Functioning Petroleum System

STRATIGRAPHIC PINCH-OUTS

TOP SEAL: THICK MARINE SHALE SECTIONS

TOE THRUST LEAD ANALOG:ANADARKO/ENI DISCOVERIES IN BLOCKS 1 & 4, MOZAMBIQUE W E

HYDROCARBON GENERATION WINDOW (HGW) WITHIN DEEP SEATED MARINE SOURCE SHALES

slide-22
SLIDE 22

22

Cretaceous ‘Area 3’ Lead Near Seep Area

slide-23
SLIDE 23

23

2D Leads Vs Planned 3D

slide-24
SLIDE 24

24

3D Seismic Acquisition / MBES and Seabed Coring

  • More than 75 leads and plays were defined in the 2-D seismic interpretation studies,

they representing a wide variety of both structural and stratigraphic plays including 4- way and fault closed anticlines, major stratigraphic pinch outs, hanging wall traps, toe thrusts, basin slope and basin floor turbidite fans, and extensive Paleogene channels. Thick, deep water Neogene shales are almost universally present to act as seals, and salt sheets may also be present.

  • An extensive 3-D seismic acquisition program of more than 9000 km² with PGS

Ramform Sterling is now underway (Q4, 2013 through Q1, 2014) in four areas to bring more than 97% of the defined leads and plays under 3-D coverage. Many of these leads and plays are expected to be elevated to drillable prospects as a result of these new, detailed 3-D seismic survey and coring /geochemical data.

  • Three proven oil source rock intervals including a massive Jurassic section (with likely

Marine Type-II Kerogen) are present nearly everywhere in the acreage and at various maturities centering on early mature to peak mature for oil. Multiple, recovered, C-25 peaked oil samples from a small number of oil slicks, persistent over many years, were found in both Juan de Nova and Belo Profond. Initial results from an October 2013 MBES and Seabed Coring campaign on the R/V Marion Dufresne suggests thermogenic hydrocarbons.

slide-25
SLIDE 25

… Africa is our home www.sapetro.com

Central African Republic

slide-26
SLIDE 26

26

Permit C: Overview

Licence Belo Profond Jurisdiction Central African Republic Licence Type PSC Participating Interest 45% SAPETRO 35% DIGOil 20% State Acreage Size: 29,000km2; Land Operatorship Yes Licence Tenor 8 years – 2 Phases of 4 years each wef 5 April 2012) Remaining Work Phase 1: 800km 2D Seismic ; Phase 2: 300km2 3D + 3 wells

slide-27
SLIDE 27

27

Why Permit C?... A Newly Discovered CARS Graben

  • This map depicts the depth to economic

basement map of the central portion of CAR Permit-C based on a 2012 airborne gravity and magnetic survey.

  • It reveals a thick sedimentary basin with up to

7,000 meters of sedimentary section in a series

  • f narrow grabens covering nearly 10,000 km²
  • The NW-SE orientation of the grabens

suggests they may have formed like other Central African Rift System grabens in Sudan, Niger, and Chad in response to the breakup of Gondwana in the late Mesozoic.

  • A number of intervening horst blocks or uplifts

are evident in the data; these could be logical first choices for investigation of hydrocarbon bearing structural traps.

slide-28
SLIDE 28

28

The Journey So Far

Production Our production growth will come from:

  • Sèmè and Egina fields starting in 2014

and 2017 respectively

  • Acquisition of proved and developed

reserves through IOC divestments in Nigeria and farm in opportunities

  • Development of discoveries from our

exploration assets

$11m $35m $94m

Exploration Expenditure

2011 2012 2013

Key Statistics

2006 2011 2016 2021 # of Assets 3 5 7 10 WI Reserves 2P (mmboe) 216 176 300 600 WI Production (bpd)

  • 25,500 24,400 50,000

Operated Assets 1 3 3 5

slide-29
SLIDE 29

29

Our Other Side

We continue to incorporate social initiatives in

  • ur countries of operations putting smiles on

several faces through

  • Support for educational programs and

infrastructure

  • Water projects in Nigeria and Madagascar
  • Health infrastructure support of worthy

initiatives

  • Economic empowerment projects in Benin
slide-30
SLIDE 30

30

Contact Details

Website: www.sapetro.com E Mail: info@sapetro.com

Nigeria (Head Office)

South Atlantic Petroleum Limited 2nd, 11th and 12th Floors South Atlantic Petroleum Towers 1, Adeola Odeku Street Victoria Island, Lagos Tel: +234 (0) 1 270 1906, +234 (0) 903 2750, +234 (0) 462 3100 Fax: +234 (0) 1 270 1907

Benin Republic

South Atlantic Petroleum Benin SA Lot H27, Les Cocotiers, 01 B. P. 327, Cotonou, Republique du Benin Tel: +229 21 30 5039, +229 21 30 5055, +229 21 30 5090 Fax: +229 21 30 5044

France

South Atlantic Petroleum JDN SAS 9 Rue du Faubourg Saint Honore, 75008 Paris Tel: +33 1 42 66 02 20

Madagascar

South Atlantic Petroleum BP SAS 26 Avenue Général Ramanantsoa, Isoraka BP 3788, Antaninarenina, Antananarivo Tel: +261 20 22 5 4920