RD RDF Exp xport, Brexi xit and UK Plant Capacity Mark Terrell - - PowerPoint PPT Presentation
RD RDF Exp xport, Brexi xit and UK Plant Capacity Mark Terrell - - PowerPoint PPT Presentation
RD RDF Exp xport, Brexi xit and UK Plant Capacity Mark Terrell General Manager Andusia Recovered Fuels Ltd Wh Who are An Andusia Re Recovered Fuels Ltd? Leading the way in RDF solutions . Largest UK independent exporter since 2013
Wh Who are An Andusia Re Recovered Fuels Ltd?
Leading the way in RDF solutions.
- Largest UK independent exporter since 2013
- Supplying RDF waste across Central Europe and Scandinavia to EfW Plants
- Directors have a combined 40+ year experience
Andusia Recovered Fuels Limited 2
“ We have worked with Andusia for several years now and
they make what can be a complicated process flow seamlessly and operate a highly efficient business.”
UK RDF Supplier
An Andusia Ti Timeline
Andusia Recovered Fuels Limited 3
2012 2013 2014 2015 2016 2017 2018
Andusia established First contract signed with European Plant Doubled supplied tonnage No 1 Independent exporter in the UK 750,000 tonnes supplied for recovery 900,000 tonnes supplied for recovery 1Millionth Tonne
1 1 Millionth To Tonne
Andusia Recovered Fuels Limited 4
New Phase of Waste Infrastruct cture Development
- We are moving into a new era
- Changing UK infrastructure
- New UK WTE plants being built
- New UK WTE plants being planned
- Brexit
- Changing many things
- Perceived risk
- World development
- China recycling restrictions
- Global consumptions of raw materials
Andusia Recovered Fuels Limited 5
Ex Export Market
- RDF tonnage has appeared to plateau
- 2016 & 2017 - 99.7% difference
- Export not going anywhere – 2018 the same??
- UK expansion is required to cope with demand
Andusia Recovered Fuels Limited 6
- 500,000
1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 2014 2015 2016 2017 2018
Export Volumes of RDF/SRF
2014 2015 2016 2017 2018
UK UK Market
- Landfill decreasing
- New WTE plants being built
- But not enough
- Even predicting a long way in the future
- Not enough treatment capacity to treat
- ur own waste
- RDF still critical
Andusia Recovered Fuels Limited 7
Br Brexit on the waste market
Andusia Recovered Fuels Limited 8
Br Brexit Timeline
- 2018 : Current Situation
- 2019 : BREXIT
- 2021 : Transition Period
- Future : Perceived risk
Andusia Recovered Fuels Limited 9
2018 Now 2019 2020 2021 Brexit deal to be announced New wave of WTE plants Post EU period Transitional period
Br Brexit Issues
- A number of perceived risks
- Demand will still be there
- We need each other
Andusia Recovered Fuels Limited 10
Exchange rate
- Change costs for RDF
Tariffs
- Taxing imports
- Increasing cost of RDF
Customs controls
- Slowing down movements
- Making export more complicated
Environmental standards
- Requirements of how waste is managed
- Additional treatment
Ex Exchange Rates
Andusia Recovered Fuels Limited 11
Brexit Referendum Low point 1.08
- Exchange rate fell massively since Brexit
- Has the low point been found?
- Stabilisingin the last 6 months
Ta Tariffs
- Negative priced – RDF
- Tariffs highly unlikely
- European plant can reduce price
- Market will bear the cost
Andusia Recovered Fuels Limited 12
Cu Customs Co Controls
- Possible tougher customers checks
- More complicated to export
Exports will need to be:
- Experienced in exports
- Increase checks and balances
- Possible additional work
Andusia Recovered Fuels Limited 13
En Environmental Standards
- UK to follow EU standards
- Commitment from Government to do this
- Framework of legislation in place
- No perceived issues
Andusia Recovered Fuels Limited 14
Ot Other Drivers Ou Outside of Europe
Andusia Recovered Fuels Limited 15
Ch China Waste Regulations
- China has cracked down on plastic imports
- Prices for plastic falling
- Some plastics there is virtually no options
Consequently:
- More plastics in general waste
- Increase calorific value of waste
- Get worse before getting better
Andusia Recovered Fuels Limited 16
Wh What does the UK new w infrastructure hold?
Andusia Recovered Fuels Limited 17
Pl Planning Permission Required
- Very difficult to gain planning where it is required
- London and South East
- Major cities
- Planning in industrial heartland is easier, however there is
- ver capacity
- North East of England
- Yorkshire
- Avonmouth
- Planning permission for new plants here
Andusia Recovered Fuels Limited 18
Te Technology Selection
- Conventional EfW (too large)
- Proven – robust
- Scale is critical 300ktpa+
- Gasification (good fit for new plants)
- New technology for waste – signature plants
working already
- Progressing well
- Scalable - 100-150ktpa
- Others – Pyrolysis / Bio-refineries (not suitable)
- A long way to go yet
Andusia Recovered Fuels Limited 19
10 10 Year - Wa Waste Supply Contract
- Fixed price required – with RPI/CPI
- Fixed volume – put or pay
- Fixed term – bankable – long enough to pay off debt
- Waste prices are market driven
- Essentially the cost of collecting your bin
- Large tier 1 companies will not take large risks
Andusia Recovered Fuels Limited 20
UK UK Capacity & Infrastructure
- Waste supply contract is critical for new EfW
- Banks want low risk
- Funders and the market can be poles apart
- Is the aggregator model positioned to close this gap?
Andusia Recovered Fuels Limited 21
Ag Aggregator model
- What we do is”
- Taking the risk in the supply chain
- Enabling SME to reach higher
- Enabling EfW to reach lower
Andusia Recovered Fuels Limited 22
- No. of supply contractors
EfW Supply Contract
Andusia (Aggregator)
Co Conclusion
- Short Term Vs Long Term
- Changing landscape – Brexit issues, China, World market
- Long term deals offer great value
- Experience guide require for the next 5 years
- 2021 onwards UK to step up new waste infrastructure
Andusia Recovered Fuels Limited 23
Th Thank you Qu Questions?