  • Purpose and Need
  • Key Project Features
  • Right of Way Acquisition
  • Questions

Outline

Integrity ∙ Excellence ∙ Respect

slide-3
SLIDE 3
  • Parks Highway, MP 44-52, Phase 3, Pittman

Road to Big Lake Road

  • Glenn Highway, MP 34-42, Glenn-Parks

Interchange to Arctic Avenue

  • Knik-Goose Bay Road, MP 0.3 to 6.8, Centaur

Avenue to Vine Road

Focus on 3 Valley Projects

Integrity ∙ Excellence ∙ Respect

slide-4
SLIDE 4
  • Purpose:

All three project corridors are National Highway System (NHS) routes whose primary function is moving goods and services with limited, safe, access.

Common Purpose and Need

Integrity ∙ Excellence ∙ Respect

slide-5
SLIDE 5
  • Need:

― All three projects address the

safety problems caused by uncontrolled access, while reducing congestion, and increasing travel efficiency.

― Knik-Goose Bay and Parks

Highway have high crash rates and are designated safety corridors.

Common Purpose and Need

Integrity ∙ Excellence ∙ Respect

slide-6
SLIDE 6

Project Description: Parks Highw ay

Integrity ∙ Excellence ∙ Respect

2/8/2017

slide-7
SLIDE 7
  • 4-lane divided highway
  • Partial controlled access
  • No change in design speed
  • Median openings on ½ mile spacing
  • Frontage roads where feasible and to enhance

access for adjacent residents/businesses

  • Separate multi-use pathway, Wasilla to Big

Lake

Key Project Features: Parks Highw ay

Integrity ∙ Excellence ∙ Respect

slide-8
SLIDE 8

Design: Parks Highw ay

Integrity ∙ Excellence ∙ Respect

slide-9
SLIDE 9
  • 2010 to 2013
  • Preliminary Design
  • 2013-2017
  • Final design and right-of-way acquisition
  • 2018
  • Construction begins
  • (Depending on availability of funding.)

Project Schedule: Parks Highw ay

Integrity ∙ Excellence ∙ Respect

slide-10
SLIDE 10

Project Description: Glenn Highw ay

Integrity ∙ Excellence ∙ Respect

2/8/2017

slide-11
SLIDE 11
  • 4-lane divided highway
  • Partial controlled access
  • No change in design speed
  • Median openings on ½ mile spacing
  • Frontage roads where feasible and to enhance

access for adjacent residents/businesses

  • Separate multi-use pathway, Palmer to

Matanuska State Park

Key Project Features: Glenn Highw ay

Integrity ∙ Excellence ∙ Respect

slide-12
SLIDE 12

Design: Glenn Highw ay

Integrity ∙ Excellence ∙ Respect

slide-13
SLIDE 13
  • 2013-2015
  • Environmental document completed
  • 2015-2018
  • Design and right-of-way acquisition
  • 2019
  • Earliest phased Construction could begins
  • (Depending on availability of funding.)

Project Schedule: Glenn Highw ay

Integrity ∙ Excellence ∙ Respect

slide-14
SLIDE 14

Project Description: KGB Road

Integrity ∙ Excellence ∙ Respect

2/8/2017

slide-15
SLIDE 15
  • 4-lane divided highway
  • No change in design speed
  • Frontage roads where feasible and to enhance

access for adjacent residents/businesses

  • Separate multi-use pathway on north side

Key Project Features: KGB Road

Integrity ∙ Excellence ∙ Respect

slide-16
SLIDE 16

Design: KGB Road

Integrity ∙ Excellence ∙ Respect

T ypic al Se c tions:

MAC K RO A D T O C ENT AUR AVENUE FO UR- L ANE URBAN SEC T IO N: RAISED MEDIAN & SEPARAT ED MUL T I- USE PAT HWAY VINE RO AD T O MA C K RO AD FO UR- L ANE RURAL SEC T IO N: DEPRESSED G RASS MEDIAN & SEPARAT ED MUL T I- USE PAT HWAY

slide-17
SLIDE 17
  • 2015
  • Environmental Document Completed
  • 2016 – 2018
  • Design and Right-of-Way Acquisition
  • 2019
  • Construction (Depending on availability of funding.)

Project Schedule: KGB

Integrity ∙ Excellence ∙ Respect

slide-18
SLIDE 18
  • General steps
  • Fair market appraisal
  • Offer to property owner
  • Relocation assistance
  • Closing and payment

Right-of-Way Acquisition

slide-19
SLIDE 19
  • Using consultant teams in Parks and Glenn

projects

  • Challenges
  • Relocation locations for businesses
  • Relocation locations for residents
  • General public understanding of acquisition

process

  • Eminent domain use

Right-of-Way Acquisition

slide-20
SLIDE 20
  • Parks Highway, MP 44-52
  • http://www.parkshighway44-52.info
  • Glenn Highway, MP 34-52
  • http://brooks-alaska.com/glennhighway/
  • Knik-Goose Bay
  • http://dot.alaska.gov/creg/kgb_cv/index.shtml#

For more information:

Integrity ∙ Excellence ∙ Respect

slide-21
SLIDE 21

ROW Information/Resources

http://www.dot.state.ak.us/stwddes/dcsrow/downloads.shtml

slide-22
SLIDE 22

Questions