May 19, 2020 9 a.m. to Noon csuchico.edu wildlife.ca.gov - - PowerPoint PPT Presentation

may 19 2020 9 a m to noon
SMART_READER_LITE
LIVE PREVIEW

May 19, 2020 9 a.m. to Noon csuchico.edu wildlife.ca.gov - - PowerPoint PPT Presentation

parks.ca.gov May 19, 2020 9 a.m. to Noon csuchico.edu wildlife.ca.gov 5/19/2020 Vina Subbasin Stakeholder Advisory Committee Vina Subbasin Stakeholder Advisory 5/19/2020 Committee Vina Subbasin Stakeholder Advisory 5/19/2020 Committee


slide-1
SLIDE 1

Vina Subbasin Stakeholder Advisory Committee

May 19, 2020 9 a.m. to Noon

parks.ca.gov wildlife.ca.gov csuchico.edu

5/19/2020

slide-2
SLIDE 2

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-3
SLIDE 3

5/19/2020 Vina Subbasin Stakeholder Advisory Committee

slide-4
SLIDE 4

DATE TBD Vina Subbasin Stakeholder Advisory Committee

Precipitation ET Diversions Urban Use Rimflows Qin Qin Pumping Stream-GW Interaction Interbasin Flow

5/19/2020 Vina Subbasin Stakeholder Advisory Committee

slide-5
SLIDE 5

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-6
SLIDE 6
  • Process of “turning knobs” so “observed” data better matches model

“simulated” results

  • Can involve
  • Refining data inputs (ex. Diversion data)
  • Adjusting physical properties (ex. Hydraulic Conductivity = parameter

reflecting how well water moves through the material)

Vina Subbasin Stakeholder Advisory Committee

  • Ex. Groundwater Level Data
  • Ex. Calculated Groundwater

Level by the model

5/19/2020

slide-7
SLIDE 7

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-8
SLIDE 8

Area Calibration Wells Key Wells North of Vina Subbasin 28 Vina Subbasin 86 27 Butte Subbasin 97 19 Wyandotte Creek Subbasin 18 7 South of Butte and Wyandotte Creek Subbasins 86

8 5/19/2020 Vina Subbasin Stakeholder Advisory Committee

slide-9
SLIDE 9

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

DRAFT

slide-10
SLIDE 10

Vina Subbasin Stakeholder Advisory Committee 10 5/19/2020

slide-11
SLIDE 11

Vina Subbasin Stakeholder Advisory Committee 11 5/19/2020

Multi-Completion Well: Screened 740-800 ft

slide-12
SLIDE 12

Multi-Completion Well: Screened 336-377 ft

Vina Subbasin Stakeholder Advisory Committee 12 5/19/2020

slide-13
SLIDE 13

13 5/19/2020 Vina Subbasin Stakeholder Advisory Committee

slide-14
SLIDE 14

Vina Subbasin Stakeholder Advisory Committee 14 5/19/2020

slide-15
SLIDE 15

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-16
SLIDE 16

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-17
SLIDE 17

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-18
SLIDE 18

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

Vina North Management Area

slide-19
SLIDE 19

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

Vina Chico Management Area

slide-20
SLIDE 20

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

Vina South Management Area

slide-21
SLIDE 21

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-22
SLIDE 22

DRAFT

Vina Subbasin Stakeholder Advisory Committee 22 5/19/2020

slide-23
SLIDE 23

Vina Subbasin Stakeholder Advisory Committee 23 5/19/2020

DRAFT

slide-24
SLIDE 24

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-25
SLIDE 25

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-26
SLIDE 26

Groundwater Pumping Stream Accretions Basin Boundary Subsurface Outflows Subsurface Inflows Change in Storage Groundwater System Western Boundary (net) Surface Water Outflows Change in Storage Stream Losses Deep Percolation Precipitation Evapotranspiration Surface Water Inflows Land and Surface Water System

Vina Subbasin Stakeholder Advisory Committee

(Reporting of Water Budgets in GSP Includes Additional Detail)

Inflows Outflows Exchanges Change in Storage

5/19/2020

slide-27
SLIDE 27

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-28
SLIDE 28

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

Native vegetation includes grasslands and riparian.

slide-29
SLIDE 29

Vina Subbasin Stakeholder Advisory Committee

DRAFT

411 TAF/yr (26.7 in)

5/19/2020

slide-30
SLIDE 30

Vina Subbasin Stakeholder Advisory Committee

DRAFT

363 TAF/yr (23.6 in)

5/19/2020

Native vegetation includes grasslands, riparian, and wetlands.

slide-31
SLIDE 31

Vina Subbasin Stakeholder Advisory Committee

DRAFT

263 TAF/yr (17.1 in)

5/19/2020

slide-32
SLIDE 32

Vina Subbasin Stakeholder Advisory Committee

DRAFT

193 TAF/yr (12.5 in)

5/19/2020

slide-33
SLIDE 33

Vina Subbasin Stakeholder Advisory Committee

DRAFT

20 TAF/yr

Negative values denote water moving from the groundwater system to the streams.

5/19/2020

slide-34
SLIDE 34

Vina Subbasin Stakeholder Advisory Committee

DRAFT

Negative values denote water moving from the groundwater system to the streams. These flows may be referred to as gains or accretions. Positive values denote water moving from the streams to the groundwater system. These flows may be referred to as seepage, leakage,

  • r losses.

5/19/2020

slide-35
SLIDE 35

Vina Subbasin Stakeholder Advisory Committee

67 TAF/yr

Includes Foothill Area and Butte, Los Molinos, and Wyandotte Creek Subbasins

DRAFT

5/19/2020

slide-36
SLIDE 36

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

slide-37
SLIDE 37

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

slide-38
SLIDE 38

Vina Subbasin Stakeholder Advisory Committee

DRAFT

  • 56 TAF/yr

Negative values suggest net outflows to western boundary, which could represent Sacramento River accretions and/or flows to the Corning Subbasin.

5/19/2020

slide-39
SLIDE 39

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

slide-40
SLIDE 40

Vina Subbasin Stakeholder Advisory Committee

DRAFT

Annual Groundwater Budget and Cumulative Change in Storage

Year Types: Critical (C), Dry (D), Below Normal (BN), Above Normal (AN), Wet (W) Average Decrease in GW Storage: 20 TAF/yr

5/19/2020

slide-41
SLIDE 41

Vina Subbasin Stakeholder Advisory Committee

DRAFT

Annual Groundwater Pumping and Cumulative Change in Storage

Year Types: Critical (C), Dry (D), Below Normal (BN), Above Normal (AN), Wet (W)

Other key drivers include recharge from precipitation. Changes in storage are driven largely by drought conditions and corresponding Influences on other water budget components.

Average Decrease in GW Storage: 20 TAF/yr

5/19/2020

slide-42
SLIDE 42

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

slide-43
SLIDE 43

Vina Subbasin Stakeholder Advisory Committee 5/19/2020

slide-44
SLIDE 44

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

slide-45
SLIDE 45

Vina Subbasin Stakeholder Advisory Committee

DRAFT

5/19/2020

slide-46
SLIDE 46

Vina Subbasin Stakeholder Advisory Committee

DRAFT Current Conditions Future Conditions

Land Use Acres Agricultural 83,276 Developed 24,819 Native 77,210 Land Use Acres Agricultural 82,766 Developed 31,459 Native 71,081

5/19/2020

Future Development Based on 2030 General Plan and Parcel Zoning

slide-47
SLIDE 47

Vina Subbasin Stakeholder Advisory Committee

DRAFT

Climate Scenarios in Other GSPs

2030CT – 2030 Central Tendency 2070CT – 2070 Central Tendency 2070DW – 2070 Drier with Extreme Warming 2070WW – 2070 Wetter with Moderate Warming

5/19/2020

slide-48
SLIDE 48

Vina Subbasin Stakeholder Advisory Committee

DRAFT

Precipitation Reference Evapotranspiration

2030CT – 2030 Central Tendency 2070CT – 2070 Central Tendency 2070DW – 2070 Drier with Extreme Warming 2070WW – 2070 Wetter with Moderate Warming

5/19/2020

slide-49
SLIDE 49

Vina Subbasin Stakeholder Advisory Committee

DRAFT

2030CT – 2030 Central Tendency 2070CT – 2070 Central Tendency 2070DW – 2070 Drier with Extreme Warming 2070WW – 2070 Wetter with Moderate Warming

50 100 150 200 250 300 350 400 Rock Creek Mud Creek Big Chico Creek Little Chico Creek Butte Creek Others

Acre-Feet (thousands)

CC 2030CT 2070CT 10 20 30 40 50 60 70 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Acre-Feet (thousands)

CC 2030CT 2070CT 5 10 15 20 25 30 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Acre-Feet (thousands)

CC 2030CT 2070CT 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Acre-Feet (thousands)

CC 2030CT 2070CT 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Acre-Feet (thousands)

CC 2030CT 2070CT 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Acre-Feet (thousands)

CC 2030CT 2070CT

Butte Creek Big Chico Creek Little Chico Creek Rock Creek Mud Creek Annual Inflows

5/19/2020