Legislative Office Building December 12, 2001 Database status - - PowerPoint PPT Presentation

legislative office building december 12 2001 database
SMART_READER_LITE
LIVE PREVIEW

Legislative Office Building December 12, 2001 Database status - - PowerPoint PPT Presentation

Legislative Office Building December 12, 2001 Database status & evolution to web presence Final reports to districts K12 Preliminary Findings Physical Infrastructure Networking Equipment & Wiring Connections


slide-1
SLIDE 1

Legislative Office Building December 12, 2001

slide-2
SLIDE 2
  • Database status & evolution to web presence
  • Final reports to districts
  • K12 Preliminary Findings

– Physical Infrastructure – Networking Equipment & Wiring – Connections within a district – Connections from the District out to the Internet – Network Support Service

  • Preliminary recommendations
slide-3
SLIDE 3
  • Data Center Completion
  • Help Desk / Network Operations Center
  • Phase 1 Sites (1st 6 K12, Backbone, HiEd)

– Circuit Installations / Circuit Extensions – CEN Equipment Installation – Cutover planning / Execution

  • Phase 2 Sites
slide-4
SLIDE 4
  • State Master Agreement
  • Leased “Unlit” Fiber over extended term
  • Long term aggregate cost moved into up-

front payments, lower ongoing cost

  • Monitoring, Maintenance, Repair by vendor
slide-5
SLIDE 5
  • Fully Redundant links to each location
  • 6 times more bandwidth to grow into
  • Less equipment to be upgraded in future
  • Vendor is responsible for maintaining the

cables on the poles and outside break/fix

slide-6
SLIDE 6

CEN Fiber Backbone

October 2001 4 Strands for delivery in Spring 2002 Future CEN backbone expansion

slide-7
SLIDE 7

TOWN STERLI NG K EN T S HA RON L YME L EBA NON S TAFFORD S ALISB URY H ADDAM N EWTOWN GOS HEN L ITCHFIE LD K IL LINGLY GR ANB Y N ORFOLK U NION GU ILFORD WOODSTOCK D ANBURY N EW MILFORD S UFFIE LD S ALE M H EB RON TOLLA ND L EDY ARD THOMPS ON P OMFRE T A VON C ORNWA LL E NFIE LD A SH FORD M A NSFIE LD C ANA AN MA DIS ON E AS T HA DDA M M ONTVILLE OXFOR D GR EEN WICH HAM DE N P LAINFIE LD BER LIN GR OTON C OLCHESTER E AS TON R EDDING GLA STONB URY WILTON C OVEN TR Y S TAM FOR D S HE LTON GR ISWOLD S OME RS S IM S BURY P RESTON C HES HIR E S OUTHBU RY H ARTLA ND WINDSOR E AS T L YME B RISTOL MIDDLETOWN E LLINGTON WA RREN WOODBU RY TORRINGTON FA IRFIELD C ANTON N ORWICH S TONINGTON C ANTER BURY MONROE R IDGE- FIELD WINDHA M WA SH- INGTON WA LLINGFORD D URHAM E AS TFORD WA TE R- FORD WILLING- TON R OXBU RY B ROOKLY N NORTH S TONINGTON ME RIDE N C OLEBR OOK MILFORD H AM PTON B AR KHA MS TE D HA R- WINTON WINCHE STER SOUTH- INGTON OLD L YME B OZRAH PUTNAM E AS T H AMPTON S HE R- MAN K IL LING- WORTH M ORRIS BURL- INGTON WE STON NEW H ARTFORD LIS BON B ETHA NY C HAP LIN WA TE RBU RY P ORTLAND N ORWA LK TRU MBULL WATE R- TOWN B ETHE L FARMINGTON V ER NON C OLUMB IA WOLCOTT BLOOM- FIELD P LY M- OUTH OR ANGE FRA NKL IN MA N- C HES TE R B RA NFOR D CLINTO N B OLTON E SS EX C HES TER WE STPORT S COTLAND E AST WINDSOR D ARIEN SOUTH WINDSOR NEW C ANA AN H ART- FORD NEW FA IRFIELD B ETH- L EHE M A ND- OVER B ROOK- FIELD NEW H AV EN STRA TFO RD S EY MOU R M ARL- B OROUGH N ORTH HA VE N N ORTH B RAN

  • FORD

S PR A- GUE M IDDLE- BU RY WOOD- B RIDGE P ROS- P ECT N AUGA

  • TUCK

WE ST H ARTFORD BRIDGE- PORT E AS T GR ANB Y WE ST- B ROOK NORTH C ANA AN D EEP RIVER ROCKYHILL B RIDGE- WATER EA ST H ARTFORD C ROMWELL N EWING- TON N EW B RITA IN OLD S AY

  • B

ROOK MIDDLE- FIE LD EA STHAVEN THOMAS

  • TON

P LAIN- V ILLE WES T H AV EN WE TH ERS

  • FIELD

D ERBY AN- SONIA B EA CON FA LLS WINDSOR L OC KS NE W L ON DON V OLUN

M ay 12, 2000

N

Massachusetts Rhode Island New York Awarded Contract Initial Service Area Other vendor’s leased fiber proposal

slide-8
SLIDE 8

Leased Fiber Services Traditional Services

$29,012,900 $19,657,100 $10,301,300 $4,687,820 $2,816,660 $1,871,160 Operating $945,500 One Time $8,272,750 $7,263,000 $5,798,250 $4,919,400 $4,626,450 $292,950 Operating $3,450,000 One Time

15 Years 10 Year 5 Year 2 Year 1 Year

slide-9
SLIDE 9
  • Expect to issue another RFP for additional

leased fiber providers

  • Will be using this contract in combination

with traditional services

  • Great deal of enthusiasm in networking

community

slide-10
SLIDE 10

Edge Router Types: A - ATM OC-3 / 2 FE UTP B - ATM OC-3 / 1 GE MMF C - POS OC-3 / 1 GE MMF D - 1 GE SMF / 1 GE MMF

State Education Network Spring 2001 Optical Layer

Proposed Configuration March 15, 2001

Internet 2 New England Gigapop Comodity Internet Qwest UCAVP 7206 "Libraries" State Library Network CSUSYS UCHLT H UCHTF D UCLAW K12SALEM K12SHLTN K12PLFD Commodity Internet AT&T State Agency Networks

STATE DATA CENTER EAST HARTFORD

CSUCEN T UCSTO R New London OC-12 POS OC-12 ATM GSR 12012 Storrs CRCT C GSR 12012 "Higher Education" K12DANBO K12BRSTL K12DANHS K12HTFD A A A A A A B C C C C C C C C D SNET Frame Relay OC-3 Network Interfaces (T1's not shown) GSR 12012 "K-12 EdNet" N2H2 Filtering N2H2 Filtering Firewall Firewall State Backbone Ethernet CSUEAS T

slide-11
SLIDE 11

INTERNET PROVIDER #1 DSL

Connecticut Education Network

One Proposed Scenario for Summer 2002 UConn Internet 2 New England Gigapop UConn Commodity Internet Qwest ENSW095

New London Qwest POP OC-12 ATM

ENRT078C

UCONN Storrs

ENRT065D UCONN LAW ENRT155B UCONN Hartford ENRT052B UCONN Health ENRT059B

UCONN Avery Point

ENRT078B

Backbone GSR

ENRT043B

HIGHER ED

ENRT065C CTC ENRT163B

ECSU

ENRT126A

Shelton HS

ENRT109A

Plainfield BOE

ENRT017A

Bristol BOE

ENRT065A

Hartford BOE

N2H2 Filtering N2H2 Filtering ENRT043D

MGMT/IPSEC

ENRT065B CSU ENRT089B CCSU

Cricket Traffic Monitor

ENRT043A

K-12

ENSW043A

K12/LIB ATM SWITCH

CEN Backbone B

Firewall Firewall

CEN Backbone A

WhatsUp Web Server

DOIT Mgmt/Mainframe Access

ENRT043C

Libraries

ENRT034B

Danbury HS

ENRT034A

Danbury BOE

Commodity Internet ENRT151B

Rowland Center

OC-3 ATM ENRT151C

UConn Waterbury

ENRT088B

Naug Valley CC

ENRT088A

Naugatuck HS

ENRT151A

Waterbury BOE

ENRT011A ENRT084A

Milford High

ENRT101A

North Haven High

ENRT101A

North Haven High

ENRT080A

Meriden Town Hall

ENRT167A

Amity Reg HS

ENRT002A

Ansonia HS

ENRT126A

Shelton HS

ATM

(Backup Link)

ENRT037A

Derby HS

ENRT156A

West Haven High

ENRT044A

East Haven High

ENRT062B

ACES - Hamden

ENRT062A

Hamden HS

ENRT093A

New Haven BOE

ENRT156B

Qwest ROW POP

ENRT093B

Yale

ENRT062C

SCSU - Hamden

ENRT093C

Gateway CommTech

ENRT093D

Albertus Magnus College

ENRT156C

Univ of New Haven

ENRT083A

Middletown Schools

ENRT025A

Cheshire Town Hall

ATM

(Backup Link)

ENRT148A

Sheehan High - Wallingford

ENRT065B

Trinity College

ENRT043E ENRT090A

New Cannan

ENRT021A

Canaan HS

ENRT095A

New London BOE

Connecticut Library Network SNET ATM OC-3 Network Interfaces ENRT095A

East Windsor BOE

ENRT089A

New Britain Slade Middle

ENRT089C

Charter Oak State College

ENRT089B

CCSU - New Britain

ENRT033A

Cromwell Middle Schools

ENRT043F ENRT083B

Wesleyan Campus

This gigabit ethernet portion of the network is still under design review. This diagram should be viewed as conceptual and is not final.

slide-12
SLIDE 12

K EN T S HA RON L YME L EBA NON S TAFFORD S ALISB URY H ADDAM N EWTOWN GOS HEN L ITCHFIE LD K IL LINGLY GR ANB Y N ORFOLK U NION GU ILFORD WOODSTOCK D ANBURY N EW MILFORD S UFFIE LD S ALE M H EB RON TOLLA ND L EDY ARD THOMPS ON P OMFRE T A VON C ORNWA LL E NFIE LD A SH FORD M A NSFIE LD C ANA AN MA DIS ON E AS T HA DDA M M ONTVILLE OXFOR D GR EEN WICH HAM DE N P LAINFIE LD BER LIN GR OTON C OLCHESTER E AS TON R EDDING GLA STONB URY WILTON C OVEN TR Y S TAM FOR D S HE LTON GR ISWOLD S OME RS S IM S BURY P RESTON C HES HIR E S OUTHBU RY H ARTLA ND WINDSOR E AS T L YME B RISTOL MIDDLETOWN E LLINGTON WA RREN WOODBU RY TORRINGTON FA IRFIELD C ANTON N ORWICH S TONINGTON C ANTER BURY MONROE R IDGE- FIELD WINDHA M WA SH- INGTON WA LLINGFORD D URHAM E AS TFORD WA TE R- FORD WILLING- TON R OXBU RY B ROOKLY N NORTH S TONINGTON ME RIDE N C OLEBR OOK MILFORD H AM PTON B AR KHA MS TE D HA R- WINTON WINCHE STER SOUTH- INGTON OLD L YME B OZRAH PUTNAM E AS T H AMPTON S HE R- MAN K IL LING- WORTH M ORRIS BURL- INGTON WE STON NEW H ARTFORD LIS BON B ETHA NY C HAP LIN WA TE RBU RY P ORTLAND N ORWA LK TRU MBULL WATE R- TOWN B ETHE L FARMINGTON V ER NON C OLUMB IA WOLCOTT BLOOM- FIELD P LY M- OUTH OR ANGE FRA NKL IN MA N- C HES TE R B RA NFOR D CLINTO N B OLTON E SS EX C HES TER WE STPORT S COTLAND E AST WINDSOR D ARIEN SOUTH WINDSOR NEW C ANA AN H ART- FORD NEW FA IRFIELD B ETH- L EHE M A ND- OVER B ROOK- FIELD NEW H AV EN STRA TFO RD S EY MOU R M ARL- B OROUGH N ORTH HA VE N N ORTH B RAN

  • FORD

S PR A- GUE M IDDLE- BU RY WOOD- B RIDGE P ROS- P ECT N AUGA

  • TUCK

WE ST H ARTFORD BRIDGE- PORT E AS T GR ANB Y WE ST- B ROOK NORTH C ANA AN D EEP RIVER ROCKYHILL B RIDGE- WATER EA ST H ARTFORD C ROMWELL N EWING- TON N EW B RITA IN OLD S AY

  • B

ROOK MIDDLE- FIE LD EA STHAVEN THOMAS

  • TON

P LAIN- V ILLE WES T H AV EN WE TH ERS

  • FIELD

D ERBY AN- SONIA B EA CON FA LLS WINDSOR L OC KS NE W L ON DON V OLUNTOWN STERLI NG

M ay 12, 2000

N

5 5 10 15 20 25 30 Miles

Massachusetts Rhode Island New York Phase 1 Activities (present) Phase 2 Activities (Spring 2002) Phase 3 Activities (Summer 2002 – Spring 2003)

slide-13
SLIDE 13
  • Attendance from 6 Privates, 3 Publics
  • Discussion on collaborative efforts, K-12

interactions, inter-institutional needs

  • Internet Service Provider Provisioning
  • Monthly to bi-monthly meetings anticipated
slide-14
SLIDE 14

(CEN Funded Circuits)

N = Number of Participating Colleges M = Requested Megabits for that site Cost Calculator Cost per site = ($250,000 / n /12) + ($320 $320 * M)

slide-15
SLIDE 15

(CEN Backbone Circuits)

Current Stand Alone Costs 10 Institutions 150 Mbps $101,459 / mo Collaborative Model 10 Institutions 150 Mbps $49,483 / mo Collaborative Model Plus 10 Institutions 234 Mbps $76,500 / mo

slide-16
SLIDE 16

http://www.doit.state.ct.us/cen FAQ’s Architecture Engineering Status Monitoring / Traffic Monitoring

slide-17
SLIDE 17

Contact Information:

Rob Vietzke, CEN Network Architect 860-622-2238 Rob.Vietzke@uconn.edu John Vittner, CEN Implementation Manager 860-622-2241 John.Vittner@po.state.ct.us Bob Dixon, Director of Enterprise Network Services 860-622-2435 Robert.Dixon@po.state.ct.us

www.doit.state.ct.us/cen