Legislative Office Building December 12, 2001 Database status - - PowerPoint PPT Presentation
Legislative Office Building December 12, 2001 Database status - - PowerPoint PPT Presentation
Legislative Office Building December 12, 2001 Database status & evolution to web presence Final reports to districts K12 Preliminary Findings Physical Infrastructure Networking Equipment & Wiring Connections
- Database status & evolution to web presence
- Final reports to districts
- K12 Preliminary Findings
– Physical Infrastructure – Networking Equipment & Wiring – Connections within a district – Connections from the District out to the Internet – Network Support Service
- Preliminary recommendations
- Data Center Completion
- Help Desk / Network Operations Center
- Phase 1 Sites (1st 6 K12, Backbone, HiEd)
– Circuit Installations / Circuit Extensions – CEN Equipment Installation – Cutover planning / Execution
- Phase 2 Sites
- State Master Agreement
- Leased “Unlit” Fiber over extended term
- Long term aggregate cost moved into up-
front payments, lower ongoing cost
- Monitoring, Maintenance, Repair by vendor
- Fully Redundant links to each location
- 6 times more bandwidth to grow into
- Less equipment to be upgraded in future
- Vendor is responsible for maintaining the
cables on the poles and outside break/fix
CEN Fiber Backbone
October 2001 4 Strands for delivery in Spring 2002 Future CEN backbone expansion
TOWN STERLI NG K EN T S HA RON L YME L EBA NON S TAFFORD S ALISB URY H ADDAM N EWTOWN GOS HEN L ITCHFIE LD K IL LINGLY GR ANB Y N ORFOLK U NION GU ILFORD WOODSTOCK D ANBURY N EW MILFORD S UFFIE LD S ALE M H EB RON TOLLA ND L EDY ARD THOMPS ON P OMFRE T A VON C ORNWA LL E NFIE LD A SH FORD M A NSFIE LD C ANA AN MA DIS ON E AS T HA DDA M M ONTVILLE OXFOR D GR EEN WICH HAM DE N P LAINFIE LD BER LIN GR OTON C OLCHESTER E AS TON R EDDING GLA STONB URY WILTON C OVEN TR Y S TAM FOR D S HE LTON GR ISWOLD S OME RS S IM S BURY P RESTON C HES HIR E S OUTHBU RY H ARTLA ND WINDSOR E AS T L YME B RISTOL MIDDLETOWN E LLINGTON WA RREN WOODBU RY TORRINGTON FA IRFIELD C ANTON N ORWICH S TONINGTON C ANTER BURY MONROE R IDGE- FIELD WINDHA M WA SH- INGTON WA LLINGFORD D URHAM E AS TFORD WA TE R- FORD WILLING- TON R OXBU RY B ROOKLY N NORTH S TONINGTON ME RIDE N C OLEBR OOK MILFORD H AM PTON B AR KHA MS TE D HA R- WINTON WINCHE STER SOUTH- INGTON OLD L YME B OZRAH PUTNAM E AS T H AMPTON S HE R- MAN K IL LING- WORTH M ORRIS BURL- INGTON WE STON NEW H ARTFORD LIS BON B ETHA NY C HAP LIN WA TE RBU RY P ORTLAND N ORWA LK TRU MBULL WATE R- TOWN B ETHE L FARMINGTON V ER NON C OLUMB IA WOLCOTT BLOOM- FIELD P LY M- OUTH OR ANGE FRA NKL IN MA N- C HES TE R B RA NFOR D CLINTO N B OLTON E SS EX C HES TER WE STPORT S COTLAND E AST WINDSOR D ARIEN SOUTH WINDSOR NEW C ANA AN H ART- FORD NEW FA IRFIELD B ETH- L EHE M A ND- OVER B ROOK- FIELD NEW H AV EN STRA TFO RD S EY MOU R M ARL- B OROUGH N ORTH HA VE N N ORTH B RAN
- FORD
S PR A- GUE M IDDLE- BU RY WOOD- B RIDGE P ROS- P ECT N AUGA
- TUCK
WE ST H ARTFORD BRIDGE- PORT E AS T GR ANB Y WE ST- B ROOK NORTH C ANA AN D EEP RIVER ROCKYHILL B RIDGE- WATER EA ST H ARTFORD C ROMWELL N EWING- TON N EW B RITA IN OLD S AY
- B
ROOK MIDDLE- FIE LD EA STHAVEN THOMAS
- TON
P LAIN- V ILLE WES T H AV EN WE TH ERS
- FIELD
D ERBY AN- SONIA B EA CON FA LLS WINDSOR L OC KS NE W L ON DON V OLUN
M ay 12, 2000N
Massachusetts Rhode Island New York Awarded Contract Initial Service Area Other vendor’s leased fiber proposal
Leased Fiber Services Traditional Services
$29,012,900 $19,657,100 $10,301,300 $4,687,820 $2,816,660 $1,871,160 Operating $945,500 One Time $8,272,750 $7,263,000 $5,798,250 $4,919,400 $4,626,450 $292,950 Operating $3,450,000 One Time
15 Years 10 Year 5 Year 2 Year 1 Year
- Expect to issue another RFP for additional
leased fiber providers
- Will be using this contract in combination
with traditional services
- Great deal of enthusiasm in networking
community
Edge Router Types: A - ATM OC-3 / 2 FE UTP B - ATM OC-3 / 1 GE MMF C - POS OC-3 / 1 GE MMF D - 1 GE SMF / 1 GE MMF
State Education Network Spring 2001 Optical Layer
Proposed Configuration March 15, 2001
Internet 2 New England Gigapop Comodity Internet Qwest UCAVP 7206 "Libraries" State Library Network CSUSYS UCHLT H UCHTF D UCLAW K12SALEM K12SHLTN K12PLFD Commodity Internet AT&T State Agency Networks
STATE DATA CENTER EAST HARTFORD
CSUCEN T UCSTO R New London OC-12 POS OC-12 ATM GSR 12012 Storrs CRCT C GSR 12012 "Higher Education" K12DANBO K12BRSTL K12DANHS K12HTFD A A A A A A B C C C C C C C C D SNET Frame Relay OC-3 Network Interfaces (T1's not shown) GSR 12012 "K-12 EdNet" N2H2 Filtering N2H2 Filtering Firewall Firewall State Backbone Ethernet CSUEAS T
INTERNET PROVIDER #1 DSL
Connecticut Education Network
One Proposed Scenario for Summer 2002 UConn Internet 2 New England Gigapop UConn Commodity Internet Qwest ENSW095
New London Qwest POP OC-12 ATM
ENRT078C
UCONN Storrs
ENRT065D UCONN LAW ENRT155B UCONN Hartford ENRT052B UCONN Health ENRT059B
UCONN Avery Point
ENRT078B
Backbone GSR
ENRT043B
HIGHER ED
ENRT065C CTC ENRT163B
ECSU
ENRT126A
Shelton HS
ENRT109A
Plainfield BOE
ENRT017A
Bristol BOE
ENRT065A
Hartford BOE
N2H2 Filtering N2H2 Filtering ENRT043D
MGMT/IPSEC
ENRT065B CSU ENRT089B CCSU
Cricket Traffic Monitor
ENRT043A
K-12
ENSW043A
K12/LIB ATM SWITCH
CEN Backbone B
Firewall Firewall
CEN Backbone A
WhatsUp Web Server
DOIT Mgmt/Mainframe Access
ENRT043C
Libraries
ENRT034B
Danbury HS
ENRT034A
Danbury BOE
Commodity Internet ENRT151B
Rowland Center
OC-3 ATM ENRT151C
UConn Waterbury
ENRT088B
Naug Valley CC
ENRT088A
Naugatuck HS
ENRT151A
Waterbury BOE
ENRT011A ENRT084A
Milford High
ENRT101A
North Haven High
ENRT101A
North Haven High
ENRT080A
Meriden Town Hall
ENRT167A
Amity Reg HS
ENRT002A
Ansonia HS
ENRT126A
Shelton HS
ATM
(Backup Link)
ENRT037A
Derby HS
ENRT156A
West Haven High
ENRT044A
East Haven High
ENRT062B
ACES - Hamden
ENRT062A
Hamden HS
ENRT093A
New Haven BOE
ENRT156B
Qwest ROW POP
ENRT093B
Yale
ENRT062C
SCSU - Hamden
ENRT093C
Gateway CommTech
ENRT093D
Albertus Magnus College
ENRT156C
Univ of New Haven
ENRT083A
Middletown Schools
ENRT025A
Cheshire Town Hall
ATM
(Backup Link)
ENRT148A
Sheehan High - Wallingford
ENRT065B
Trinity College
ENRT043E ENRT090A
New Cannan
ENRT021A
Canaan HS
ENRT095A
New London BOE
Connecticut Library Network SNET ATM OC-3 Network Interfaces ENRT095A
East Windsor BOE
ENRT089A
New Britain Slade Middle
ENRT089C
Charter Oak State College
ENRT089B
CCSU - New Britain
ENRT033A
Cromwell Middle Schools
ENRT043F ENRT083B
Wesleyan Campus
This gigabit ethernet portion of the network is still under design review. This diagram should be viewed as conceptual and is not final.
K EN T S HA RON L YME L EBA NON S TAFFORD S ALISB URY H ADDAM N EWTOWN GOS HEN L ITCHFIE LD K IL LINGLY GR ANB Y N ORFOLK U NION GU ILFORD WOODSTOCK D ANBURY N EW MILFORD S UFFIE LD S ALE M H EB RON TOLLA ND L EDY ARD THOMPS ON P OMFRE T A VON C ORNWA LL E NFIE LD A SH FORD M A NSFIE LD C ANA AN MA DIS ON E AS T HA DDA M M ONTVILLE OXFOR D GR EEN WICH HAM DE N P LAINFIE LD BER LIN GR OTON C OLCHESTER E AS TON R EDDING GLA STONB URY WILTON C OVEN TR Y S TAM FOR D S HE LTON GR ISWOLD S OME RS S IM S BURY P RESTON C HES HIR E S OUTHBU RY H ARTLA ND WINDSOR E AS T L YME B RISTOL MIDDLETOWN E LLINGTON WA RREN WOODBU RY TORRINGTON FA IRFIELD C ANTON N ORWICH S TONINGTON C ANTER BURY MONROE R IDGE- FIELD WINDHA M WA SH- INGTON WA LLINGFORD D URHAM E AS TFORD WA TE R- FORD WILLING- TON R OXBU RY B ROOKLY N NORTH S TONINGTON ME RIDE N C OLEBR OOK MILFORD H AM PTON B AR KHA MS TE D HA R- WINTON WINCHE STER SOUTH- INGTON OLD L YME B OZRAH PUTNAM E AS T H AMPTON S HE R- MAN K IL LING- WORTH M ORRIS BURL- INGTON WE STON NEW H ARTFORD LIS BON B ETHA NY C HAP LIN WA TE RBU RY P ORTLAND N ORWA LK TRU MBULL WATE R- TOWN B ETHE L FARMINGTON V ER NON C OLUMB IA WOLCOTT BLOOM- FIELD P LY M- OUTH OR ANGE FRA NKL IN MA N- C HES TE R B RA NFOR D CLINTO N B OLTON E SS EX C HES TER WE STPORT S COTLAND E AST WINDSOR D ARIEN SOUTH WINDSOR NEW C ANA AN H ART- FORD NEW FA IRFIELD B ETH- L EHE M A ND- OVER B ROOK- FIELD NEW H AV EN STRA TFO RD S EY MOU R M ARL- B OROUGH N ORTH HA VE N N ORTH B RAN
- FORD
S PR A- GUE M IDDLE- BU RY WOOD- B RIDGE P ROS- P ECT N AUGA
- TUCK
WE ST H ARTFORD BRIDGE- PORT E AS T GR ANB Y WE ST- B ROOK NORTH C ANA AN D EEP RIVER ROCKYHILL B RIDGE- WATER EA ST H ARTFORD C ROMWELL N EWING- TON N EW B RITA IN OLD S AY
- B
ROOK MIDDLE- FIE LD EA STHAVEN THOMAS
- TON
P LAIN- V ILLE WES T H AV EN WE TH ERS
- FIELD
D ERBY AN- SONIA B EA CON FA LLS WINDSOR L OC KS NE W L ON DON V OLUNTOWN STERLI NG
M ay 12, 2000N
5 5 10 15 20 25 30 Miles
Massachusetts Rhode Island New York Phase 1 Activities (present) Phase 2 Activities (Spring 2002) Phase 3 Activities (Summer 2002 – Spring 2003)
- Attendance from 6 Privates, 3 Publics
- Discussion on collaborative efforts, K-12
interactions, inter-institutional needs
- Internet Service Provider Provisioning
- Monthly to bi-monthly meetings anticipated
(CEN Funded Circuits)
N = Number of Participating Colleges M = Requested Megabits for that site Cost Calculator Cost per site = ($250,000 / n /12) + ($320 $320 * M)
(CEN Backbone Circuits)
Current Stand Alone Costs 10 Institutions 150 Mbps $101,459 / mo Collaborative Model 10 Institutions 150 Mbps $49,483 / mo Collaborative Model Plus 10 Institutions 234 Mbps $76,500 / mo
http://www.doit.state.ct.us/cen FAQ’s Architecture Engineering Status Monitoring / Traffic Monitoring
Contact Information:
Rob Vietzke, CEN Network Architect 860-622-2238 Rob.Vietzke@uconn.edu John Vittner, CEN Implementation Manager 860-622-2241 John.Vittner@po.state.ct.us Bob Dixon, Director of Enterprise Network Services 860-622-2435 Robert.Dixon@po.state.ct.us