G2X has assembled the critical components for success
G2X Energy has assembled proven processes, proven expertise, and proven partners, to develop mid-stream infrastructure projects in order to create high-value fuels from abundant supplies of low-cost natural gas located in North America
▲ Proman Group, the world leader in building and
plants, is an investor in G2X Energy as well as a strategic partner that will contribute important development, construction and
▲ With a 30-year record of success in starting, capitalizing and building businesses, G2X Energy’s leadership team is equipped to develop, finance, build, and
natural gas to gasoline projects in North America ▲ ExxonMobil Research and Engineering, who has developed a clean and proven methanol to gasoline technology, has granted G2X certain license rights to its technology
TEAM PROCESS TECHNOLOGY
2
Lake Charles, LA Pampa, TX
Methanol Plant – Construction Stage Gas to Gasoline Plant – Development Stage
–
Natural gas-to-methanol plant
–
Located in the Texas Panhandle
–
185 MT/d methanol capacity
–
Under construction
G2X has taken critical steps towards successful growth
3
–
Natural gas-to-gasoline plant
–
Located in the Lake Charles, Louisiana
–
12,500 Bbl/d gasoline capacity
–
In development
Natural Gas to Methanol
G2X will use two critical processes for its Natural Gas to Gasoline Plant
4
Methanol to Gasoline
Nat Gas + Water Syngas Methanol Methanol Gasoline
Catalyst Catalyst Catalyst
DME
Catalyst
Lake Charles, LA
Lake Charles is ideal location for first Natural Gas to Gasoline Plant
5
▲ A Site in the Port of Lake Charles in Southwest Louisiana satisfies all key criteria ▲ Key local partners are critical to the success of G2X Projects
Site Selection Criteria
Local Gvt. Support
Permitting Environment Deep Water Port End-Product Logistics Feedstock Availability Support Services Skilled Labor Pool
G2X’s first Gasoline Plant to be located on Industrial Canal
6
Site Location & Plant Rendering
Big Lake Fuels Site Lake Charles, LA
Calcasieu River
Louisiana Key Highlights
▲ 200 acre site owned by the Port of Lake Charles ▲ Located five miles south of Lake Charles, LA,
– Access to Gulf Intracoastal Waterway – Access to Gulf of Mexico ▲ Close proximity to multiple interstate natural gas pipelines ▲ Water (for process and cooling) and power connection easily accessible
Lafayette Houston Gulf of Mexico Beaumont Port Arthur
Sabine Lake Galveston Bay Calcasieu River
Lake Charles
Calcasieu Lake
Site
7
Site offers access to local customers and direct route to Gulf of Mexico
Calcasieu Refinery Citgo Refinery Conoco Phillips Refinery Trunkline LNG G2X/Big Lake Fuels Site
Plant Rendering
Ample room for process, storage, and admin areas
8
Example of Synthesis Area
G2X will need to import some large equipment from outside the US
9
Transport
Dock Configuration
Site to have two docks to handle large construction and marine vessels
10
Key Highlights
Proposed Dredging ▲G2X docks to be dredged to Industrial Canal depth (~40 feet) Basic Dock Design ▲Construction dock will have the ability to handle large equipment (up to 650MT) ▲Products dock will have the ability to load large marine vessels (up to 750’ length x 120’ beam x 38’ draft)
= Dredge Prism
Key Milestones
G2X is in advanced stages of development for its first Gasoline Plant
11
Executed Option to Lease Agreement for Site Site Screening & Initial Site Due Diligence Start of Initial Engineering Work Secured MTG Technology License Filing of Air Permit with LDEQ Air Permit Received
Q1 2012 Q1 2013 Q3 2013 Q2 2013 Q4 2013 Q2 2014 Q1 2014 Q3 2014 Q4 2014 Q4 2012
Air Permit and USACE Public Notice Filing of Section 404/10 Permits with USACE Completion of Initial Complex Integration Design Basis
G2X Contact Information
12
G2X Energy, Inc. 600 Travis, Suite 3680 Houston, Texas 77002
Steve Hirsh Vice President, Head of Project Development Office: 713-943-2200 Email: steve.hirsh@g2xenergy.com