International Trade Symposium June 6, 2014 G2X has assembled the - - PowerPoint PPT Presentation

international trade symposium
SMART_READER_LITE
LIVE PREVIEW

International Trade Symposium June 6, 2014 G2X has assembled the - - PowerPoint PPT Presentation

International Trade Symposium June 6, 2014 G2X has assembled the critical components for success G2X Energy has assembled proven processes, proven expertise, and proven partners, to develop mid-stream infrastructure projects in order to create


slide-1
SLIDE 1

International Trade Symposium

June 6, 2014

slide-2
SLIDE 2

G2X has assembled the critical components for success

G2X Energy has assembled proven processes, proven expertise, and proven partners, to develop mid-stream infrastructure projects in order to create high-value fuels from abundant supplies of low-cost natural gas located in North America

▲ Proman Group, the world leader in building and

  • perating methanol

plants, is an investor in G2X Energy as well as a strategic partner that will contribute important development, construction and

  • perational capabilities

▲ With a 30-year record of success in starting, capitalizing and building businesses, G2X Energy’s leadership team is equipped to develop, finance, build, and

  • perate large-scale

natural gas to gasoline projects in North America ▲ ExxonMobil Research and Engineering, who has developed a clean and proven methanol to gasoline technology, has granted G2X certain license rights to its technology

TEAM PROCESS TECHNOLOGY

PR PROVE VEN

2

slide-3
SLIDE 3

Lake Charles, LA Pampa, TX

Methanol Plant – Construction Stage Gas to Gasoline Plant – Development Stage

Natural gas-to-methanol plant

Located in the Texas Panhandle

185 MT/d methanol capacity

Under construction

G2X has taken critical steps towards successful growth

3

Natural gas-to-gasoline plant

Located in the Lake Charles, Louisiana

12,500 Bbl/d gasoline capacity

In development

slide-4
SLIDE 4

Natural Gas to Methanol

G2X will use two critical processes for its Natural Gas to Gasoline Plant

4

Methanol to Gasoline

Nat Gas + Water Syngas Methanol Methanol Gasoline

Catalyst Catalyst Catalyst

DME

Catalyst

slide-5
SLIDE 5

Lake Charles, LA

Lake Charles is ideal location for first Natural Gas to Gasoline Plant

5

▲ A Site in the Port of Lake Charles in Southwest Louisiana satisfies all key criteria ▲ Key local partners are critical to the success of G2X Projects

Site Selection Criteria

Local Gvt. Support

Permitting Environment Deep Water Port End-Product Logistics Feedstock Availability Support Services Skilled Labor Pool

slide-6
SLIDE 6

G2X’s first Gasoline Plant to be located on Industrial Canal

6

Site Location & Plant Rendering

Big Lake Fuels Site Lake Charles, LA

Calcasieu River

Louisiana Key Highlights

▲ 200 acre site owned by the Port of Lake Charles ▲ Located five miles south of Lake Charles, LA,

  • n the deep water Industrial Canal

– Access to Gulf Intracoastal Waterway – Access to Gulf of Mexico ▲ Close proximity to multiple interstate natural gas pipelines ▲ Water (for process and cooling) and power connection easily accessible

Lafayette Houston Gulf of Mexico Beaumont Port Arthur

Sabine Lake Galveston Bay Calcasieu River

Lake Charles

Calcasieu Lake

Site

slide-7
SLIDE 7

7

Site offers access to local customers and direct route to Gulf of Mexico

Calcasieu Refinery Citgo Refinery Conoco Phillips Refinery Trunkline LNG G2X/Big Lake Fuels Site

slide-8
SLIDE 8

Plant Rendering

Ample room for process, storage, and admin areas

8

slide-9
SLIDE 9

Example of Synthesis Area

G2X will need to import some large equipment from outside the US

9

Transport

slide-10
SLIDE 10

Dock Configuration

Site to have two docks to handle large construction and marine vessels

10

Key Highlights

Proposed Dredging ▲G2X docks to be dredged to Industrial Canal depth (~40 feet) Basic Dock Design ▲Construction dock will have the ability to handle large equipment (up to 650MT) ▲Products dock will have the ability to load large marine vessels (up to 750’ length x 120’ beam x 38’ draft)

= Dredge Prism

slide-11
SLIDE 11

Key Milestones

G2X is in advanced stages of development for its first Gasoline Plant

11

Executed Option to Lease Agreement for Site Site Screening & Initial Site Due Diligence Start of Initial Engineering Work Secured MTG Technology License Filing of Air Permit with LDEQ Air Permit Received

Q1 2012 Q1 2013 Q3 2013 Q2 2013 Q4 2013 Q2 2014 Q1 2014 Q3 2014 Q4 2014 Q4 2012

Air Permit and USACE Public Notice Filing of Section 404/10 Permits with USACE Completion of Initial Complex Integration Design Basis

slide-12
SLIDE 12

G2X Contact Information

12

G2X Energy, Inc. 600 Travis, Suite 3680 Houston, Texas 77002

Steve Hirsh Vice President, Head of Project Development Office: 713-943-2200 Email: steve.hirsh@g2xenergy.com