international trade symposium
play

International Trade Symposium June 6, 2014 G2X has assembled the - PowerPoint PPT Presentation

International Trade Symposium June 6, 2014 G2X has assembled the critical components for success G2X Energy has assembled proven processes, proven expertise, and proven partners, to develop mid-stream infrastructure projects in order to create


  1. International Trade Symposium June 6, 2014

  2. G2X has assembled the critical components for success G2X Energy has assembled proven processes, proven expertise, and proven partners, to develop mid-stream infrastructure projects in order to create high-value fuels from abundant supplies of low-cost natural gas located in North America PR PROVE VEN TEAM PROCESS TECHNOLOGY ▲ With a 30-year record of ▲ Proman Group, the world ▲ ExxonMobil Research success in starting, leader in building and and Engineering, who capitalizing and building operating methanol has developed a clean businesses, G2X plants, is an investor in and proven methanol to Energy’s leadership team G2X Energy as well as a gasoline technology, has is equipped to develop, strategic partner that will granted G2X certain finance, build, and contribute important license rights to its operate large-scale development, technology natural gas to gasoline construction and projects in North America operational capabilities 2

  3. G2X has taken critical steps towards successful growth – Natural gas-to-methanol plant – Located in the Texas Panhandle – 185 MT/d methanol capacity – Under construction – Natural gas-to-gasoline plant – Located in the Lake Charles, Louisiana – 12,500 Bbl/d gasoline capacity – In development Pampa, TX Lake Charles, LA Methanol Plant – Construction Stage Gas to Gasoline Plant – Development Stage 3

  4. G2X will use two critical processes for its Natural Gas to Gasoline Plant Natural Gas to Methanol Methanol to Gasoline Nat Gas + Syngas Methanol Methanol DME Gasoline Water Catalyst Catalyst Catalyst Catalyst 4

  5. Lake Charles is ideal location for first Natural Gas to Gasoline Plant Lake Charles, LA Site Selection Criteria ▲ A Site in the Port of Lake Charles in Southwest Louisiana satisfies Permitting all key criteria Environment ▲ Key local partners are critical to Skilled Deep Water Labor Pool Port the success of G2X Projects Local Gvt. Support Support End-Product Services Logistics Feedstock Availability 5

  6. G2X’s first Gasoline Plant to be located on Industrial Canal Key Highlights Site Location & Plant Rendering ▲ 200 acre site owned by the Port of Lake Louisiana Charles ▲ Located five miles south of Lake Charles, LA, Calcasieu on the deep water Industrial Canal River – Access to Gulf Intracoastal Waterway – Access to Gulf of Mexico Big Lake Lake Fuels Site Charles, ▲ Close proximity to multiple interstate natural LA gas pipelines ▲ Water (for process and cooling) and power connection easily accessible Calcasieu River Lafayette Lake Charles Beaumont Sabine Site Houston Lake Calcasieu Lake Port Arthur Galveston Bay Gulf of Mexico 6

  7. Site offers access to local customers and direct route to Gulf of Mexico Conoco Phillips Refinery Citgo Refinery Trunkline LNG Calcasieu Refinery G2X/Big Lake Fuels Site 7

  8. Ample room for process, storage, and admin areas Plant Rendering 8

  9. G2X will need to import some large equipment from outside the US Example of Synthesis Area Transport 9

  10. Site to have two docks to handle large construction and marine vessels Dock Configuration Key Highlights Proposed Dredging ▲ G2X docks to be dredged to Industrial Canal depth (~40 feet) Basic Dock Design ▲ Construction dock will have the ability to handle large equipment (up to 650MT) ▲ Products dock will = Dredge Prism have the ability to load large marine vessels (up to 750’ length x 120’ beam x 38’ draft ) 10

  11. G2X is in advanced stages of development for its first Gasoline Plant Key Milestones Air Permit Executed Option to and USACE Lease Agreement Public Notice for Site Secured MTG Filing of Air Air Permit Technology Permit with Received License LDEQ Q4 2012 Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2012 Completion of Initial Complex Integration Site Screening & Design Basis Initial Site Due Filing of Section 404/10 Diligence Permits with USACE Start of Initial Engineering Work 11

  12. G2X Contact Information G2X Energy, Inc. 600 Travis, Suite 3680 Houston, Texas 77002 Steve Hirsh Vice President, Head of Project Development Office: 713-943-2200 Email: steve.hirsh@g2xenergy.com 12

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend