gbb end of year summary
play

GBB End of Year Summary Brigid Reilly / Paul Tetley GAB Meeting No. - PowerPoint PPT Presentation

GBB End of Year Summary Brigid Reilly / Paul Tetley GAB Meeting No. 18 16 th December 2014 Contents GBB Changes 2014 EMF Activation Participant/Facility Registration Timeline of Events Mondarra Storage Facility Website Usage


  1. GBB End of Year Summary Brigid Reilly / Paul Tetley GAB Meeting No. 18 16 th December 2014

  2. Contents GBB Changes 2014 EMF Activation • Participant/Facility Registration • Timeline of Events • Mondarra Storage Facility • Website Usage during EMF • GBB usage GBB Statistics 2014 GBB 2015 • Production Facilities • Patch to fix GBB submissions bug • Pipelines Actual Flows • Changes to GSI fee allocation • Peak Gas Usage Day • GBB 1.4 2

  3. Changes in the GBB 2014 Gas Statistics 2014 EMF Activation GBB 2015 3

  4. Changes in GBB 2014 • 4 Participant Registrations • 3 Participant Deregistrations • 1 Facility Registration • Mondarra Storage Facility changed operational profile in January 2014 • Other • GBB release of version 1.3 went into production 27/08/2014 • GGP (Goldfields Gas Pipeline) completed expansion which increased it’s nameplate capacity from 175 TJ/day to 203 TJ/day on 26/09/2014 4

  5. Changes in Participant/Facility Registration 2014 Participants Registration Events Company Name GBB Participant Code Participant Type Date of Registration Northern Star Resources Ltd NTHERNSTAR Gas Shipper 17/03/2014 APT Facility Management Pty APT Gas Shipper 1/04/2014 Limited Facility Operator Sub161 Pty Ltd SUB161 28/06/2014 Gas Shipper Facility Operator Chevron Australia Pty Ltd CHEVRON 10/11/2014 Gas Shipper Participants Deregistration Events Company Name GBB Participant Code Participant Type Date of Deregistration Energy Retail Corporation (t/a SYNERGY Gas Shipper 31/12/2013 Synergy) Newmont Yandal Operations Pty NMONTYAN Gas Shipper 30/06/2014 Ltd Xstrata Nickel Australasia XTRATA Gas Shipper 1/04/2014 Operations Pty Ltd Facility Registration GBB Participant Code for Name of Facility Operator Facility Type Date of Facility Registration Facility Operator Sub 161 Pty Ltd SUB161 Large User 7/07/2014 5

  6. Mondarra Storage Facility • Mondarra Storage Facility (Capacity 18,000TJ) changed operational profile in January 2014 • Utilised by the pipeline July 2014 - primarily delivering into the pipeline to meet high demand Mondarra Storage Facility Aug 2013 - Nov 2014 2000 1500 Gas TJ 1000 DELIVERY RECEIPT 500 0 Axis Title 6

  7. 2014 GBB Usage Statistics 7

  8. Changes in the GBB 2014 Gas Statistics 2014 EMF Activation GBB 2015 8

  9. Production Facilities Production Facilities Output TJ Aug 2013 - Nov 2014 35000 Dongara Production Facility 30000 Beharra Springs Gas Production Facility 25000 Devil Creek Gas TJ 20000 Macedon 15000 10000 Varanus Island 5000 Karratha Gas Plant 0 Gas Month 9

  10. Production Facilities % of Gas Produced Beharra Springs Dongara Karratha Gas Gas Month Varanus Island Macedon Devil Creek Gas Production Production Plant Facility Facility Aug-13 57.1 30.3 3.9 6.6 1.9 0.2 Sep-13 50.9 26.7 13.8 6.6 1.8 0.2 Oct-13 47.9 25.2 14.2 10.6 1.9 0.2 Nov-13 42.1 26.1 16.3 14.3 1.0 0.2 Dec-13 39.1 28.2 17.5 14.9 0.1 0.2 Jan-14 46.2 31.1 14.2 7.3 0.9 0.2 Feb-14 46.2 30.0 14.7 7.9 1.0 0.2 Mar-14 48.0 30.4 14.3 6.2 0.9 0.2 Apr-14 48.0 30.8 14.3 6.1 0.7 0.2 May-14 48.3 28.5 14.4 6.7 1.9 0.2 Jun-14 49.8 25.1 15.6 7.6 1.7 0.2 Jul-14 48.5 25.4 15.9 8.3 1.7 0.1 Aug-14 52.9 21.0 15.9 8.1 2.0 0.2 Sep-14 50.5 25.6 14.9 6.9 2.0 0.1 Oct-14 47.9 28.5 14.9 6.7 1.8 0.2 Nov-14 47.8 28.9 14.2 7.1 1.8 0.1 10

  11. Pipeline Deliveries Pipeline Deliveries Telfer Gas Pipeline 40000 Pilbara Energy Pipeline 35000 30000 Parmelia Gas Pipeline 25000 TJ Mid West Pipeline 20000 15000 Goldfields Gas Pipeline 10000 5000 Dampier to Bunbury Natural Gas Pipeline 0 Gas Month 11

  12. Gas Usage Seasonality – Peak day (1/4) • Annual Average % of Gas Generation in the SWIS is 42% (see chart below) • Gas Usage Peak experienced between 07/07/2014 and 10/07/2014 • Coal outages on the SWIS of between ~500 – 750MW of coal around these days • Gas provided > 2000MW of Electricity Generation in the SWIS on 10/07/2014 % Generation Fuel Mix Dec 2013 – Nov 2014 0.68% 0.12% 0.02% 8.33% Gas Coal 41.93% Wind Bio/Landfill Solar PV 48.93% Liquid 12

  13. Gas Usage Seasonality – Peak day (2/4) TJ 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1/08/2013 15/08/2013 29/08/2013 12/09/2013 26/09/2013 Sum of Pipeline Deliveries 1/08/2013 - 1/12/2014 10/10/2013 24/10/2013 7/11/2013 21/11/2013 5/12/2013 19/12/2013 2/01/2014 16/01/2014 30/01/2014 13/02/2014 27/02/2014 13/03/2014 Gas Day 27/03/2014 10/04/2014 24/04/2014 8/05/2014 22/05/2014 5/06/2014 19/06/2014 3/07/2014 17/07/2014 31/07/2014 14/08/2014 28/08/2014 11/09/2014 10/07/2014 09/07/2014 08/07/2014 07/07/2014 Peak days 25/09/2014 9/10/2014 23/10/2014 6/11/2014 20/11/2014 13

  14. Gas Usage Seasonality – Peak day (3/4) Average Annual % Gas Generation Generation Fuel Mix % 07/07/2014 - 12/07/2014 (42%) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 07/07/2014 08/07/2014 09/07/2014 10/07/2014 11/07/2014 12/07/2014 Gas Coal Wind Bio/Landfill Solar PV Liquid 14

  15. Gas Usage Seasonality – Peak day (4/4) 2050MW of Gas Generation at Total MW Generation 07/07/2014 - 12/07/2014 10/07/2014 18:00 3500 3000 2500 Generation (MW) 2000 1500 1000 500 0 7/07/2014 8/07/2014 9/07/2014 10/07/2014 11/07/2014 12/07/2014 Gas Coal Wind Bio/Landfill Solar PV Liquid 15

  16. Changes in the GBB 2014 Gas Statistics 2014 EMF Activation GBB 2015 16

  17. EMF Activation June 6 th 2014 (1/2) Timeline of Events • Two domestic gas trains ceased operation at Karratha Gas Plant 05/06/2014 20:10PM • PUO issued Activation of the EMF at 06/06/2014 2:27PM • EMF Activated on GBB 06/06/2014 3:00PM • Partially restored operations at Karratha at 06/06/2014 2:10PM • Gas Participants are advised of their data requirements under the EMF at 06/06/2014 5:17PM • PUO issued Deactivation of the EMF at 07/06/2014 9:41AM • EMF Deactivated on GBB 07/06/2014 9:59AM • Mondarra Storage facility delivered 87TJ into pipeline on the 6/06/2014 (Daily Average 7.1TJ) 17

  18. EMF Activation June 6 th 2014 (2/2) EMF called Gas Production June 2014 Incident at Karratha 1200 Dongara Production Facility 1000 Beharra Springs Gas Production Facility 800 Devil Creek TJ/day 600 Macedon 400 Varanus Island 200 Karratha Gas Plant 0 1/06/2014 2/06/2014 3/06/2014 4/06/2014 5/06/2014 6/06/2014 7/06/2014 8/06/2014 9/06/2014 10/06/2014 11/06/2014 12/06/2014 13/06/2014 14/06/2014 15/06/2014 16/06/2014 17/06/2014 18/06/2014 19/06/2014 20/06/2014 21/06/2014 22/06/2014 23/06/2014 24/06/2014 25/06/2014 26/06/2014 27/06/2014 28/06/2014 29/06/2014 30/06/2014 Gas Day 18

  19. Linepack Capacity Adequacy 06/06/2014 19

  20. GBB Usage over EMF Activation 20

  21. Changes in the GBB 2014 Gas Statistics 2014 GBB 2015 EMF Activation GBB 2015 21

  22. GBB 2015 • Patch to fix GBB submissions bug o Fix for IE v8 Submissions bug error message – due to be released late December • Changes to GSI fee allocation starting Q1 2015 o Rule change (GRC_2014_01) to allocate fees 50:50 between Shippers and Producers • GBB 1.4 Expected Release Early Q2 2015 o Bulk query for retrieving historical data for: – Actual Flows – End User Consumption – Large User Consumption – Large User Consumption by Category o Other suggested improvements?? 22

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.