Presentation Series for FY17 Budget #1 FY17 Budget Presentation Student Services Plant & Facilities Technology Thursday, January 21, 2015 Educational Support Center PDC 6:30 p.m. 1 Student Services Budget Presented by: Kristin


slide-1
SLIDE 1

FY17 Budget Presentation

Student Services Plant & Facilities Technology

Presentation Series for FY17 Budget #1

Thursday, January 21, 2015 Educational Support Center PDC 6:30 p.m.

1

slide-2
SLIDE 2

Student Services Budget

Presented by: Kristin Campione Director of Student Services

2

slide-3
SLIDE 3

FY16 Special Education Percentages

School Total Enrollment # IEPs Percentage State Average Hardwick 221 33 14.9% 17.2% Hubbardston 313 57 18.2% New Braintree 137 36 26.3% Oakham 164 35 21.3% Ruggles Lane 398 80 20.1% QRMS 429 69 16.1% QRHS 706 119 16.9% Totals 2,395 429 17.9%

FY16 October 1 SIMS data FY13 16% FY14 18% FY15 16%

3

slide-4
SLIDE 4

FY16 Student Services Needs by School

School # IEPs* # 504 Plans # Interventionists/ Paraprofessionals^ # Special Education Teachers^ Hardwick 33 4 5.5 Interventionists 1 Paraprofessional 1.5 Hubbardston 52 14 5 Paraprofessionals 3 New Braintree 10 1 .5 Oakham 19 5 .7 Interventionist .6 Ruggles Lane 80 23 3.5 Interventionists 3 Paraprofessionals 3 QRMS 45 29 4 Paraprofessionals 2 QRHS 90 66 5 Paraprofessionals 4

*does not include students in substantially separate classrooms (>60% out of general education) ^ does not include teachers of substantially separate classrooms and their staff, 1:1 paras or K or PK paras

4

slide-5
SLIDE 5

FROM MOST RESTRICTIVE TO LEAST RESTRICTIVE Residential Placements Private Day Placements (Out of State) Private Day Placements (In State) Collaborative Placements (Non-Member Collaboratives: CMSEC, CASE) Collaborative Placements (Member Collaboratives: FLLAC, CAPS) Public School Placements (substantially separate program in other public school)

5

slide-6
SLIDE 6

*cost share with Dept. Children & Families (DCF), #cost share due to divorced parents

Placement Type of Placement # Students Hometown FY17 Projection

Easter Seals of NH, Manchester Autism, Multiple Needs

1 Barre

$95,566.49* Landmark, Beverly Language Based Learning Disabilities

1 Barre

$65,624.18 ARCHway, Leicester Autism, Multiple Needs

1 Barre

$83,859.41# Hillcrest, Lenox Autism, Multiple Needs

1 Barre

$165,305.22# New England Ctr. for Children, Southboro Autism

1 Oakham

$103,991.53* Evergreen, Walpole Autism, Multiple Needs

1 Barre

$168,982.01

6

slide-7
SLIDE 7

*cost reflects 1:1 staffing level needed while in the program

Placement Type of Placement # Students Hometown FY17 Projection

Crotched Mountain, Greenfield, NH Autism, Multiple Needs

1 Barre

$174,246.34*

7

slide-8
SLIDE 8

Placement Type of Placement # Students Hometown FY17 Projection

Devereux, Rutland Behavioral, Social/Emotional

3 Barre, 2 Hubbardston $140,627.01

White Oak, Westfield Language Based Learning Disabilities

3 Hardwick, 2 Hubbardston $128,353.66

Darnell, Marlboro Multiple Disabilities

2 Hubbardston, Barre $181,880.92

New England Ctr. for Children, Southboro Autism

2 Oakham $208,552.26

Boston Higashi, Randolph Autism

1 Hubbardston $74,705.98

Lighthouse School,

  • No. Chelmsford

Behavioral, Social/Emotional

1 Barre $70,237.61

8

slide-9
SLIDE 9

Placement Type of Placement # Students Hometown FY17 Projection

RFK, Lancaster Behavioral, Social/Emotional

1 Hubbardston $34,165.88

Summit Academy, Worcester Autism

1 Hubbardston $41,255.02

YOU, Inc., Milford Behavioral, Social/Emotional

1 Oakham $38,564.68

Learning Center Deaf, Framingham Sensory/Deaf

1 Hardwick $81,500.91

McCauley Nazareth, Leicester Behavioral, Social/Emotional

1 Barre $33,260.76 Seven Hills Academy Multiple Disabilities/Medically Fragile 1 Hardwick $50,578.27

9

slide-10
SLIDE 10

Placement Type # Students Hometown FY17 Projection CASE Collaborative, Boxborough Behavioral, Social/Emotional 1 Hubbardston $70,967.41 Central MA Spec Ed Collab (CMSEC), West Boylston Behavioral, Social/Emotional 1 Barre $44,989.58

10

slide-11
SLIDE 11

Placement Type # Students Hometown FY17 Projection CAPS Gateway, Westminster Behavior, Social/Emotional 6 3 Hardwick, 2 Barre, 1 Hubbardston $292,258.42 FLLAC Caldwell, Fitchburg Behavior, Social/Emotional 4 2 Barre, 2 Hardwick $198,170.35 CAPS Kelly Day @Hubb Ctr School Multiple Disabilities/ Medically Fragile 3 Hardwick, Barre, Hubbardston $215,195.97 FLLAC @ Ayer- Shirley HS Life Skills 2 Oakham, Hubbardston $112,296.78 CAPS Sr. Senators @ Mahar HS Multiple Disabilities/ Medically Fragile 1 Barre $65,156.98

11

slide-12
SLIDE 12

Placement Type # Students Hometown FY17 Projection Ware Middle School (Sub Sep Class)* Behavioral, Social/Emotional 2 Hubbardston, Barre $73,336.00 North Middlesex Regional (Post Grad Gateway Program Transition to Adult/Vocational/Life Skills 1 Barre $40,000.00

*1 student in grade 5 and 1 in grade 6 during FY17. They will transition to MS program at QRMS during FY 18 & FY19

12

slide-13
SLIDE 13

Type # Students Cost Residential 6 $683,328.84 Private Day (out of state) 1 $174,246.34 Private Day 18 $1,083,682.96 Collaborative (Nonmember) 2 $115,956.99 Collaborative (Member-CAPS/FLLAC) 16 $883,078.50 Public Day (other school district) 3 $113,336.00 TOTALS 46 $3,053,629.63

We also one student from Oakham who attends a residential school in Connecticut. Student is currently school choice to Wachusett and we will be billed for the residential cost on the sped increment form under School Choice.

13

slide-14
SLIDE 14

Type # Students Cost Behavioral or Social/Emotional 21 $996,577.70 Autism, Multiple Needs 5 $687,959.47 Multiple Disabilities/Medically Fragile 5 $330,931.22 Autism 5 $428,504.79 Language Based 4 $193,977.84 Multiple Disabilities 2 $181,880.92 Cognitive/Life Skills 2 $112,296.78 Sensory/Deaf 1 $81,500.91 Transition to Adult Life 1 $40,000.00 TOTALS 46 $3,053,629.63

We also one student from Oakham who attends a residential school in Connecticut. Student is currently on school choice to Wachusett and we will be billed for the residential cost on the sped increment form under School Choice.

14

slide-15
SLIDE 15

Type Explanation/Location Projected FY17 Cost Assistive Technology Consultation, Direct Service & Evaluations $10,000.00 Occupational Therapy District wide all Occupational Therapists and Certified OT Assistants (1 FTE OT & 2-.6 COTA) $167,402.81 Physical Therapy District wide 1 Physical Therapist and 1 PT Assistant (both part time) $93,045.05 Teacher of Visually Impaired Consultation, Direct Service & Evaluations $20,000.00 Speech/Language Pathology Consultation, Direct Services & Evaluations at HCS, 1 SLP and 1 SLPA (both part time) $54,299.54

15

slide-16
SLIDE 16

Type Explanation/Location Projected FY17 Cost Teacher of Visually Impaired Direct Service, Evaluations $10,000.00

16

slide-17
SLIDE 17

Vendor Explanation/Location Projected FY17 Cost New England Center for Children 2 partnership classrooms (2 teachers, BCBA consultation) $284,267.64 Julie MacIntyre Independent Consultant Adaptive Physical Education $11,030.00 Carroll School Orientation and Mobility Consultant $26,574.00 Christine George Independent Consultant BCBA $68,496.29 Debra Passios Independent Consultant Language Based Classrooms $15,000.00 Pamela Kaufmann Independent Consultant Life Skills/Transition to Adulthood $10,000.00

  • Dr. Frank Vargo

Independent Consultant Clinical Psychologist/Risk Assessments $15,000.00 TBD Program Evaluation Preschool $1,000.00

17

slide-18
SLIDE 18

Type Explanation/Location Projected FY17 Cost Attorney Matt MacAvoy Legal Representation, Professional Development $25,000.00

18

slide-19
SLIDE 19

HES None HCS Elementary Language-Based NBGS Preschool, Autism OCS Autism, Life Skills RLS None QRMS Life Skills, Therapeutic QRHS Life Skills, Therapeutic

Proposed Change: Autism program-move one of the NECC classrooms from NB/OCS to MS/HS building

19

slide-20
SLIDE 20

Program Location Staff Current Enrollment Language Based (Learning Disabilities) Hubbardston 1 teacher 1 paraprofessional 5 Autism NB/OCS 2 teachers* 12 paraprofessionals 12 (6 NB, 6 OCS) Life Skills (Cognitive Impairments) OCS 1 teacher, 2 paraprofessionals 10 Preschool NB 2 teachers 4 paraprofessionals 77 (27 IEPs) Elementary Behavioral TBD 1 teacher 1 paraprofessional Proposed New Program

*NECC teachers paid through contracted services

20

slide-21
SLIDE 21

Program Location Staff Current Enrollment Therapeutic MS (Behavior/SocEmot) QRMS 1 teacher 1 paraprofessional 15 Therapeutic HS (Behavior/SocEmot) QRHS 1 teacher 1 paraprofessional 19 Life Skills MS (Cognitive Impairments) QRMS 1 teacher 2 paraprofessionals 9 Life Skills HS (Cognitive Impairments) QRHS 1 teacher 3 paraprofessionals 10 Autism MS (combined Lang Based) QRMS 1 teacher 1 paraprofessional Proposed New Location

21

slide-22
SLIDE 22

1 Director of Student Services 1 Student Services Coordinator 3 Team Chairpersons (PK-3, 4-7, 8-12 & PG) 1 Social Worker 2 School Psychologists 3 Speech/Language Pathologists

22

slide-23
SLIDE 23
  • Autism Middle/High Program
  • Elementary Behavioral/Social Emotional Program
  • Team Chairperson for Group Home & Out District

Students(caseload of 46 students plus 24 group home students)

  • Part time clerical support (filing, scanning, telephones)
  • Additional licensed social worker to support families and

teachers of students in crisis and provide support to prevent crises.

23

slide-24
SLIDE 24

Presented by: Director of Administrative Services & Plant & Facilities Manager

slide-25
SLIDE 25

Currently

  • Custodial Supplies
  • Trash Removal
  • Snow Removal
  • Oil
  • Electricity
  • Sewer & Grease Trap Pumping

Looking Ahead

  • Plumbing & Electrical Contracting
slide-26
SLIDE 26
  • Elevator Service & Inspection
  • Backflow Preventers Testing & Inspection
  • Water Testing: Hardwick, Hubbardston, New Braintree & Oakham
  • Asbestos Inspection: Every 3 years by independent inspector (2017)
  • Alarm Monitoring
  • Fire Extinguishers Testing & Inspection
  • Smoke Detectors & Alarms Testing & Inspection
  • Sprinklers Testing & Inspection
  • Boilers & Air Compressors Inspection
  • Dam Inspection
slide-27
SLIDE 27
  • Classroom Desks & Tables:
  • Standard desks
  • Standing desks
  • Computer tables
  • Computer Lab chairs
  • Cafeteria Tables
  • Office Furniture
slide-28
SLIDE 28
  • Salaries budgeted at $1,089,809, 4.8% increase
  • Substitutes, OT, Summer budgeted at $109,458, 12.7% decrease
  • Supplies budgeted at $97,304, 1.54% decrease
  • Dues, Memberships, Publications level funded at $2,200
  • Uniforms budgeted at $9,200, 40.5% increase due to Jackets

(replaced every 3 years per CBA)

  • Travel/Conference & Travel budgeted at $8,500, 29.4% increase

due to travel stipend and professional development for Supervisor

slide-29
SLIDE 29
  • Oil budgeted at $361,219, 14.08% decrease - $1.7395/gal
  • Electricity budgeted at $368,698, 8% increase*
  • Net metering credits still not applied
  • SolarCity project still not connected to National Grid
  • Water/Sewer budgeted at $93,292, 1.7% decrease
  • Trash Removal budgeted at $41,500, 4.6% increase

* Will be adjusted with Net Metering Credits, when available

slide-30
SLIDE 30
  • Salaries budgeted at $92,853, 1.98% increase
  • Overtime budgeted at $7,200, 1.1% increase
  • Contract Services budgeted at $6,091, 17.4% increase
  • Supplies budgeted at $43,888, 172% increase
  • Seed, fertilizer, lime, grub treatment project
  • Uniforms budgeted at $690, 15% increase – Jacket replacement
  • Snow Removal budgeted at $44,700, 5.3% increase
  • Travel & Conference/Travel level funded at $2,500
slide-31
SLIDE 31
  • Salaries budgeted at $128,687, 1.98% increase
  • Overtime budgeted at $4,500, 18.2% decrease
  • General Repairs budgeted at $157,626, 21.4% increase
  • Electrical Repairs budgeted at $44,700, 23.5% increase
  • Plumbing Repairs budgeted at $30,300, 2.2% increase
  • HVAC Repairs budgeted at $107,600, 43% increase
  • Glass Repairs budgeted at $8,630, 0.6% increase
slide-32
SLIDE 32
  • Supplies & Materials level funded at $15,000
  • Uniforms budgeted at $240; new line item
  • Security Equipment & Maintenance level funded at $21,900
slide-33
SLIDE 33
  • Budgeted at $125,725

Includes:

  • MHS Café tables/chairs
  • Conference room tables/chairs
  • Student desks, tables/chairs
  • Teacher desks/chairs
  • Office furniture
  • Building & Grounds equipment, including gas & oil
slide-34
SLIDE 34
  • Building Improvements for the Quabbin Regional Middle/High

School are included in the Preliminary Budget

  • Floor replacement projects are included in the Preliminary

Budget

  • Building Improvements for the elementary schools are not

included in the Preliminary Budget and will be requested as separate warrant articles

  • Building Improvements budgeted at $185,099
slide-35
SLIDE 35

A Capital Plan has been developed and is available for review as a separate document.

slide-36
SLIDE 36

Presented by: Andrew Walsh Director of Technology

slide-37
SLIDE 37
  • Replacement of High School Domain Controller (No longer able to warranty)
  • Add cooling to 2 wiring closets
  • Add Projectors and Interactive Whiteboards to 3 classrooms
  • Add 3D printer to lab (Robotics/Design)
  • Addition of Naviance software suite (Guidance)
  • Addition of 6 Wireless Access Points
  • Refresh 30 Classroom computers
  • Replace 2 classroom projectors
  • Replace classroom computer desks
  • Replace 5 iPads for Special Education classrooms
  • Reinstatement of Lynda.com (online technology focused learning software)

Building Technology Classroom Technology Networking Hardware WAN/Internet

QRHS

slide-38
SLIDE 38
  • Refresh of 25 Classroom Computers
  • Addition of 4 iPads for Classroom instruction
  • Replacement of classroom student computer desks
  • Replace Principals desktop
  • Planned replacement of 3 projectors
  • 6 additional wireless access points

Building Technology Classroom Technology Networking Hardware WAN/Internet

QRMS

slide-39
SLIDE 39
  • Replacement of computer tables in C109 lab to allow reconfiguration and additional

computers

  • Additional collaborative workspace in Media Center
  • Add DSLR camera to accommodate increased usage
  • Replacement of aging video camera
slide-40
SLIDE 40
  • Replace Laptop Cart
  • Replace 2 Interactive Whiteboards/Projectors
  • Add 6 Wireless Access Points

Building Technology Classroom Technology Networking Hardware WAN/Internet

Ruggles Lane

slide-41
SLIDE 41
  • Refresh 15 Classroom desktops
  • Replace student computer desks
  • Replace Media Center computer chairs
  • Add “Mini” Laptop Cart
  • Add Mobile iPad Cart
  • Add 6 Wireless Access Points

Building Technology Classroom Technology Networking Hardware WAN/Internet

Hardwick

slide-42
SLIDE 42
  • Refresh 10 Classroom Computers
  • Replace Laptop Cart
  • Add 5 iPads for Student Use
  • Add 6 Wireless Access Points

Building Technology Classroom Technology Networking Hardware WAN/Internet

Hubbardston

slide-43
SLIDE 43
  • Refresh 6 Classroom Computers
  • Replace outdated document cameras
  • Add 3 Wireless Access Points

Building Technology Classroom Technology Networking Hardware WAN/Internet

New Braintree

slide-44
SLIDE 44
  • Refresh 13 Classroom Computers
  • Replace outdated document cameras
  • Add 5 Wireless Access Points

Building Technology Classroom Technology Networking Hardware WAN/Internet

Oakham Center

slide-45
SLIDE 45
  • Replace Primary Domain Controller for Administration Domain (also functions as

document server for Central Office) and Secondary Domain Controller for QRSD WAN

  • Refresh 3 Desktop Computers
  • Refresh 2 Laptops
slide-46
SLIDE 46
  • Budgeted at $134,524 (3.75% increase)

Includes:

  • Hardware in non teaching areas (Main Offices, Facilities, Hallways, Common Areas, Server

Rooms and Network Closets)

  • Contracted services such as Student Information System (Aspen), Microsoft Licensing
  • Supplies (Toner, Projector Bulbs, Miscellaneous Hardware) in non teaching areas
  • Professional Development and Conferences for building staff
  • Hardware maintenance for out of warranty parts and repairs
slide-47
SLIDE 47
  • Budgeted at $383,084 (11.2% increase)

Includes:

  • Instructional Computer Refresh (Teacher and student)
  • Increase in mobile computers (tablets, laptops)
  • Instructional software and subscriptions such as Lynda.com, Discovery Education,

BrainPOP, Reading A-Z, Type to Learn, Edgenuity (Online Distance Learning)

  • Instructional Supplies Specific to classroom (toner, projector bulbs, etc)
  • Hardware maintenance for out of warranty parts and repairs
slide-48
SLIDE 48
  • Budgeted at $164,352 (2.7% increase)

Includes:

  • Bandwidth/Wide Area Network is split amongst each school and Central Office at equal
  • share. Total cost for 2016-2017 is $143,505 prior to E-Rate
  • Networking Hardware (Switches, Ethernet cables, Wireless Access Points)
slide-49
SLIDE 49
  • Budgeted at $490,816 (1.3% increase)

Includes:

  • Salaries and Stipends $335,406 (2% increase)
  • Contracted Services $87,372 (.06% increase)
  • Extension of Original Server Warranties
  • Desktop Management Software/Antivirus Software
  • Document Retention/Management Software
  • Transportation Software
  • Financial Management Software
  • Email/Webpage Archiving and hosting
  • Backup Software Licensing
slide-50
SLIDE 50
  • Budgeted at $490,816 (1.3% increase)

Includes (continued):

  • District Wide Software $27,000 (15% increase)
  • Atlas Curriculum Software
  • Galileo Math Software
  • Professional Development/Research Subscriptions
  • Various facilities software (Time clocks, Hazmat)
  • District Wide costs also include postage, projected hardware parts for repairs,

toner/supplies, conferences and Special Education hardware and software.

  • Overall Budget: $1,172,776 (4.25% increase)