FLYNN AVE RECONSTRUCTI ON
Ward 5 Neighborhood Planning Assembly Thursday, March 21, 6:30pm City Market Community Room
123
COORDINATED PROJECTS
Water rehabilitation
FLYNN AVE RECONSTRUCTI ON Ward 5 Neighborhood Planning Assembly - - PDF document
FLYNN AVE RECONSTRUCTI ON Ward 5 Neighborhood Planning Assembly Thursday, March 21, 6:30pm City Market Community Room 1 2 3 COORDINATED PROJECTS Water rehabilitation Repaving with curb and sidewalk work Bikeway markings and
Water rehabilitation
Repaving with curb and sidewalk work Bikeway markings and parking changes
One intention: Improving east/west roads in the South End to help safely connect fragmented bike networks and pedestrian infrastructure. Why Flynn Ave?
Park and the waterfront with Pine Street and Shelburne Street
commuting to school
Council
City Market, Howard Center
along Flynn Avenue
markings westbound)
the north side (add curb and improve sidewalks)
Foster Street to Briggs Street:
bike lanes in each direction
Parking notched into greenbelt
Howard Center
Parking on north side
Howard Center
Pine Street
374
326 330
336
Shared lane markings
ni Avan 374
368
252
196
Burlington Subaru
414
Shelburne Street
Elynn Avenue
285
277 281
Fan Avenue
3:41 325
855
305
Saint Anthony
Church
375
293
387
No parking on
south side
393
Bike lanes in both directions
Eastbound bike lane
377
US 7 Pine Street
Foster Street
393
Match Line
1A
START 8'-0" PARKING LANE
EXIST. "NO PARKING ANY TIME" SIGN EXIST. "NO PARKING ANY TIME" SIGN EXIST. "NO PARKING ANY TIME" SIGN & BIKE ROUTE
***EXIST. SIDEWALK
**** ***618-6 Flynn Avenue
55'-0" T 45'-0"
_17_0"
36-3
113-02
Shelburne St. EXIST SIDEWALK
M2'-8"
BIKE LANE END
SIGN TO BE INSTALLED BY
OTHERS.
NOTE: 1) ALL BIKE LINE STRIPPING. SYMBOLS AND SIGNS ARE TO BE DONE BY OTHERS.
BURLIN
Flynn Ave (Shelburne Rd - Wells St)
IA BURLINGTON PUBLIC WORKS ENGINEERING DIV.
SCALE: 1" = 20
North
UBLIC WORX
Match Line
1B
8-0"
PARKING LANE 00 OO OOO OO ODOV
IST. SIDEWALK
< 11'-0"
11'-0" / Flynn Avenue
35'-5"
Match Line
1A
EXIST. SIDEWALK
6'-0" (MIN) BIKE LANE
NOTE: 1) ALL BIKE LINE STRIPPING, SYMBOLS & SIGNS ARE TO BE DONE BY OTHERS.
LINGTON SURLINBURLINGTON, PUBLIC WORKS ENGINEERING DIV.
PYFlynn Ave (Shelbume Rd - Wells St)
IB
FI DAMESHSCALE: 1" = 20
North
UBLIC WORKS
DEJ
Match Line
2A
EXIST. SIDEWALK ODEO EO EO EO EO EOD
8'-0" PARKING LANE
Match Line
1B
36'-0" Flynn Avenue
111'-0"
111'-0"
EXIST. SIDEWALK
6'-0" (MIN) BIKE LANE
NOTE:
1) ALL BIKE LINE STRIPPING & SYMBOLS ARE TO BE DONE BY OTHERS.
LINGUNBURLINGTON PUBLIC WORKS ENGINEERING DIV.
Flynn Ave (Wells St - Pine St)
2A
ETIT HT 042SCALE: 1" = 20
North
ID-1Match Line 2B Match Line O OOO
8'-0" PARKING LANE
VZ__ it
36'-0"
111'-0" 111'-0" Richardson St. 6'-0" (MIN) BIKE LANE
NOTE:
1) ALL BIKE LINE STRIPPING, SYMBOLS &
SIGNS ARE TO BE DONE BY OTHERS.
URLINGTON,
Flynn Ave (Wells St - Pine St)
2B BURLINGTON PUBLIC WORKS ENGINEERING DIV.
IDED IDEESSCALE: 1" = 20
North
"ublie WOW
HE TEMatch Line 20
14'-0"
176'-0"_ NEW CURB & DROP CURBS
TO BE INSTALLED (TYP) 1
8-0" EXIST. SIDEWALK PARKING LANE Match Line 2B
www35'-10". EDDEDDEO Flynn Avenue ve 111'-0" 111'-0"
EXIST. SIDEWALK
NEW CURB & ADA PADS TO BE INSTALLED (TYP.)
6'-0" (MIN) BIKE LANE
NOTE: 1) ALL BIKE LINE STRIPPING. SYMBOLS &
SIGNS ARE TO BE DONE BY OTHERS.
HG TOT IIISURLU
BURLINGTON PUBLIC WORKS ENGINEERING DIV.
Flynn Ave (Wells St - Pine St)
20
THATSCALE: 1" = 20
North
LE HD
W 11 INSTIMatch Line
ЗА
REMOVE & REINSTALL EXIST
"NO PARKING HERE TO UTILITY POLE CORNER" SIGN (TYP. OF 5)
EXIST. "SHARE 8'-0"
THE ROAD" SIGN PARKING LANE RELOCATE SPEED LIMIT &
"SLOW CHILDREN AT PLAY" SIGNS (2 TOTAL)
EXIST. LIGHT
POLE
NIIIIIIIIIIIIII NEW SIDEWALK INITIUITIT DEDJELDENDEICO ) 6'-0" (MIN) BIKE LANE Match Line
20
TIITTI
****** wwwwwwwww +++++++ ********** ******41'-0"
110'-6" 110'-6" Pine St.
EXIST. SIDEWALK
EXIST. TREES
(TYP)
5'-0" (MIN)
BIKE LANE BIKE BOX TO BE PAINTED BY OTHERS
NOTE:
1) ALL BIKE LINE STRIPPING. SYMBOLS &
SIGNS ARE TO BE DONE BY OTHERS.
ENSENURLINGTON
ESITBURLINGTON PUBLIC WORKS ENGINEERING DIV.
Flynn Ave (Pine St - Foster St)
ITU HT OUDTSCALE: I" = 20
North 3A
Match Line
3B
EXIST. "NO PARKING HERE TO DRIVEWAY" SIGN
EXIST. CATCH
BASIN
EXIST. CATCH
BASIN
REMOVE EXIST.
CONCRETE EXIST. "NO PARKING FIRE
EXIST. "RESERVED
LANE" SIGN,
PARKING"
HANDICAP SIGN EXIST. UTILITY POLE
(TYP. OF 5)
Match Line
NEW SIDEWALK | VEDETUDE DE
17'_7" 33'-'10" 6
EXISTING "NO PARKING HERE TO
CORNER" SIGN
Foster St.
NEW "BIKE LANE" - SIGN INSTALLED
BY OTHERS
NOTE:
1) ALL BIKE LINE STRIPPING & SYMBOLS ARE TO BE DONE BY OTHERS.
GTON,VT
URLINGTON
BURLINGTON PUBLIC WORKS ENGINEERING DIV.
Flynn Ave (Pine St - Foster St)
3B
DUSCALE: 1"= 20
North
Public Works Commission for a decision at their meeting on Wednesday, April 17.
Meetings begin at 6:30pm at 645 Pine Street and public comments are
available in advance at http://bit.ly/PWC-Agendas.
can be shared anytime with dpwplanning@burlingtonvt.gov
Any proposal that passes the Commission will be implemented in coordination with paving.Add your email to the sign-in sheet to receive updates before the Commission meeting.
TOTAL Past CAPITAL REINVESTMENT
Annual Investment
since
2017 Final 2018 Final
Passage of Infrastructure Bonds
Paving ~ 3 miles 5.13 miles 7.37 miles 12.50 miles Sidewalk Reconstruction ~ 1 mile 3.0 miles total 2.86 miles 5.86 miles Water Main Relining As needed 1.78 miles 1.93 miles 3.71 miles Water Main Replacement As needed 0.44 miles 1.5 miles 1.94 miles Curb As needed 0.62 mile 0.53 miles 1.15 miles Sewer/Stormwater Rehab Pipe As needed $165K $272K $437K CAPITAL REINVESTMENT PROGRESS
SINCE 2016 Key Principle: Coordinated Asset Investment Key Principle: Coordinated Asset Investment
○ Timing: Mid April - July ○ Traffic: Two Way Maintained ○ Key Detail: Pits, closer to side of road
○ Timing: 1st half of season ○ Traffic: Traffic control to include two way flow during peak travel
Page & Website
2019 paving, sidewalk and water projects: burlingtonvt.gov/construction
SeeClickFix.com
802-863-4501/water- resources@burlingtonvt.gov
Season Info: burlingtonvt.gov/DPW/Reinvestment