1 SOUTH SOUTH LOCKW OCKWOOD OOD KENYA WILLIAMS CAPITAL PROJECTS - PowerPoint PPT Presentation

1 SOUTH SOUTH LOCKW OCKWOOD OOD KENYA WILLIAMS CAPITAL PROJECTS PICK UP PICK UP A A BL BLUE UE CA CARD RD 3 PURPOSE PURPOSE together we create a strong foundation for Houston to thrive 4 SERVICE SER VICE LINES LINES 5


  1. 1

  2. SOUTH SOUTH LOCKW OCKWOOD OOD KENYA WILLIAMS CAPITAL PROJECTS

  3. PICK UP PICK UP A A BL BLUE UE CA CARD RD 3

  4. PURPOSE PURPOSE together we create a strong foundation for Houston to thrive 4

  5. SERVICE SER VICE LINES LINES 5

  6. LET’S TALK ABOUT what is this project design update next steps + who to contact break out session 6

  7. SOUTH LOCKWOOD (PHASE 1) TYPE PAVING & DRAINAGE COST $5.4 MILLION START SUMMER 2021 COMPLETION TBD MAIN CONTACT ISMAT ARA – PROJECT MANAGER 832.395.2394 | ISMAT.ARA@HOUSTONTX.GOV Project #: N-100027-0001-3 7

  8. SOUTH LOCKWOOD (PHASE 2) TYPE PAVING & DRAINAGE COST $12.2 MILLION START 2023 COMPLETION TBD MAIN CONTACT ISMAT ARA – PROJECT MANAGER 832.395.2394 | ISMAT.ARA@HOUSTONTX.GOV Project #: N-100027-0001-3 8

  9. SOUTH L SOUTH LOC OCKW KWOOD OOD BY BY THE THE NUMB NUMBERS ERS (+/ (+/-) 3,825 6,125 LINEAR FT. OF SANITARY SEWER LINEAR FT. OF STORM SEWER 6,100 7,400 LINEAR FT. OF NEW SIDEWALK/ LINEAR FT. OF WATER LINES BIKE TRAILS 40 1.1 ADA CURB RAMPS MILES OF NEW PAVEMENT 9

  10. EXISTING EXISTING CO COND NDITIONS ITIONS 10

  11. OVERA VERALL LL SITE SITE PL PLAN AN 11

  12. SOUTH LOC SOUTH OCKW KWOOD OOD AT CA T CANAL AL ST STREET REET Roundabout Benefits ‒ Improved safety (reduction in injury, fatal and overall crashes) ‒ Improved traffic flow ‒ Less speeding ‒ Eliminated hardware, maintenance, and electrical costs associated with traffic signals 12

  13. SOUTH SOUTH LOC OCKW KWOOD OOD AT N T NAVI VIGA GATION TION 13

  14. TYPICAL S TYPICAL SECTION ECTION 10’ 5.5’ 5.5’ 10’ 20’ Shared Use Path Buffer Buffer Shared Use Path Median 14

  15. NEXT ST NEXT STEP EPS ‒ Complete Final Design ‒ Award Construction Contract ‒ Coordination between your management district and/or HOA group for designing center of roundabout ‒ Construction Public Engagement Meeting 15

  16. OPP OPPOR ORTUNITIES TUNITIES FOR T FOR THIR HIRD D PAR ARTY FUND TY FUNDING ING 16

  17. WHO T WHO TO C O CONT ONTACT CT call 311 (713.837.0311) visit www.houstontx.gov/311 (provide project #) download the houston311 app email buildforward@houstontx.gov 17

  18. CO COMPL MPLET ETE E THE THE B BLUE UE CA CARD RD 18

  19. thank you! houstonpublicworks.org @houpublicworks

  20. BREAK OUT BREAK OUT SE SESS SSION ION 20

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.